Hysbysiad contract
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Mid and East Antrim Borough Council
Ardeevin, 80 Galmorgan Road
Ballymena
BT42 1AB
UK
E-bost: procurement@midandeastantrim.gov.uk
NUTS: UKN0F
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https//www.midandeastantrim.gov.uk
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
https://e-sourcingni.bravosolution.co.uk
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
https://e-sourcingni.bravosolution.co.uk
Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
ICT SERVICES FOR STABILISATION AND REPAIR WORKS OF CARRICKFERGUS PEIRS
Cyfeirnod: T675/AD
II.1.2) Prif god CPV
71311000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
The Client invites tenders to provide the service for an ICT in relation to stabilisation and repair works of Carrickfergus Piers from RIBA stages 3-6.
A Carrickfergus Harbour Condition Assessment reports was completed in 2018 by AECOM and updated in 2023 by Doran’s. The 2023 updated Condition Assessment of Carrickfergus Harbour report along with its, Options for Remedial Works, has been used to develop the business case and is the preferred option of works.
The project is for the provision of an ICT to assist the client in the delivery of stabilisation and repair works of Carrickfergus Piers.
Works to include but not limited to:
The consult to review the Doran’s Condition Assessment of Carrickfergus Harbour & Remedial Works Report carried out in 2023 and provide an addendum to the current condition of the harbour structures highlighting priority repairs which are to be included as part of the contract.
Albert Edward Peir
- Anode replacement
- Anode Installation
- RC Skin to parapet wall
Alexandra Pier
- Investigate the purpose and ownership of the piles close to the gangway ramp
- Visual inspection of the slab above the structure
- Resurfacing works
- Anode replacement
- RC skin to parapet wall
William Pier
- Removal of marine growth
- Replace missing stones
- Repointing with lime mortar
- Sealed culvert: install stone facing similar to existing to the upstream and downstream faces. Wedged concrete to be saw cut flush with the structure.
Possible removal works of old smuggles cove restaurant.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKN0F
II.2.4) Disgrifiad o’r caffaeliad
The Client invites tenders to provide the service for an ICT in relation to stabilisation and repair works of Carrickfergus Piers from RIBA stages 3-6.
A Carrickfergus Harbour Condition Assessment reports was completed in 2018 by AECOM and updated in 2023 by Doran’s. The 2023 updated Condition Assessment of Carrickfergus Harbour report along with its, Options for Remedial Works, has been used to develop the business case and is the preferred option of works.
The project is for the provision of an ICT to assist the client in the delivery of stabilisation and repair works of Carrickfergus Piers.
Works to include but not limited to:
The consult to review the Doran’s Condition Assessment of Carrickfergus Harbour & Remedial Works Report carried out in 2023 and provide an addendum to the current condition of the harbour structures highlighting priority repairs which are to be included as part of the contract.
Albert Edward Peir
- Anode replacement
- Anode Installation
- RC Skin to parapet wall
Alexandra Pier
- Investigate the purpose and ownership of the piles close to the gangway ramp
- Visual inspection of the slab above the structure
- Resurfacing works
- Anode replacement
- RC skin to parapet wall
William Pier
- Removal of marine growth
- Replace missing stones
- Repointing with lime mortar
- Sealed culvert: install stone facing similar to existing to the upstream and downstream faces. Wedged concrete to be saw cut flush with the structure.
Possible removal works of old smuggles cove restaurant.
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 24
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Na
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law
Dyddiad:
18/03/2025
Amser lleol: 12:00
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
IV.2.7) Amodau ar gyfer agor tendrau
Dyddiad:
18/03/2025
Amser lleol: 12:01
Section VI: Gwybodaeth ategol
VI.1) Gwybodaeth am ailddigwydd
Caffaeliad cylchol yw hwn:
Na
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Mid and East Antrim Borough Council
Ballymena
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
13/02/2025