Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
Greater Manchester Combined Authority
GMCA Offices, 1st Floor, Churchgate House, 56 Oxford Street
Manchester
M1 6EU
UK
E-bost: procurement@manchesterfire.gov.uk
NUTS: UKD3
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: http://www.manchesterfire.gov.uk/
Cyfeiriad proffil y prynwr: http://www.manchesterfire.gov.uk/
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
GMCA1677 Wigan CFAS Solar PV And Optional Battery Storage
Cyfeirnod: DN798228
II.1.2) Prif god CPV
45300000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Greater Manchester Combined Authority declared a climate change emergency in 2019 and continues to progress towards the ambition of achieving carbon neutrality by 2038. A key element in achieving this ambition is to continue investing in renewable technologies to reduce reliance on grid electricity and generating electricity from renewable sources.
Greater Manchester Combined Authority has been successful in securing grant funding from Great British Energy via the Mayoral Renewables Fund to deliver a solar photovoltaic (PV) system and an optional addition of a battery storage system at Wigan Community Fire and Ambulance Station. The bid was developed from findings from a low carbon feasibility survey covering whole building decarbonisation for the site which identified that the building may benefit from the installation of an additional solar PV system to the existing solar PV system and the integration of a battery storage system.
This further competition was a call off via the NHS SBS Decarbonisation of Estates Framework (Reference: SBS10504).
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.1.7) Cyfanswm gwerth y caffaeliad
Cynnig isaf: 29 853.06 GBP / Y cynnig uchaf: 74 694.93 GBP
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKD3
II.2.4) Disgrifiad o’r caffaeliad
The project is expected to be delivered in a staged manner. The project has a feasibility survey completed but the first stage of the project will require a roof condition survey and a structural assessment to be completed (stage 1) in order to ensure the roof has sufficient integrity to hold the solar PV system. Upon completion of the surveys and receipt of the reports, Greater Manchester Combined Authority shall confirm whether the project is to progress to the next stage (stage 2). Stage 2 will focus upon the full design of the solar PV system plus the design of an optional addition of an integrated battery storage system along with the identification of a relevant supply chain. Upon receipt of the design documents at the end of stage 2, Greater Manchester Combined Authority will make a decision on whether the project shall proceed to stage 3 which shall be the installation and commissioning of the system. For clarity, Greater Manchester Combined Authority may take the decision to not proceed from design stage to install but may also take the decision whether to proceed with either the additional solar PV system only or the additional solar PV system and the optional addition of the battery storage system.
The solar PV and optional addition of a battery storage system at Wigan Community Fire and Ambulance Station is expected to be delivered under a Design and Build Contract (JCT Contracted Design arrangement) and will require the successful bidder to undertake the design (including all related survey activity), supply, installation, testing and commissioning of a roof mounted solar PV system and, if Greater Manchester Combined Authority decide to progress, an externally located battery storage system (optional addition).
The project is funded by Great British Energy via the Mayoral Renewables Fund and a key grant funding criteria is that the scheme must be fully completed by 31st March 2026.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Design and Supply Capability
/ Pwysoliad: 20
Maes prawf ansawdd: Delivery in Live Operational Environments
/ Pwysoliad: 10
Maes prawf ansawdd: Installation and Demonstrated Impact
/ Pwysoliad: 20
Maes prawf ansawdd: Social Value
/ Pwysoliad: 10
Price
/ Pwysoliad:
40
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
The provision of an externally located battery storage system is an optional purchase during the lifetime of the contract.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gyfyngedig
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Na
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2025/S 000-054981
Section V: Dyfarnu contract
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
14/01/2026
V.2.2) Gwybodaeth am dendrau
Nifer y tendrau a ddaeth i law: 3
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
CARBON3 LTD
61 London Road
Maidstone
ME16 8TX
UK
NUTS: UKD3
BBaCh yw’r contractwr:
Ydy
V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)
Cynnig isaf: 29 853.06 GBP / Y cynnig uchaf: 74 694.93 GBP
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court England and Wales
London
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
06/03/2026