Hysbysiad dyfarnu contract – cyfleustodau
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
NIE Networks Ltd
120 Malone Road
Belfast
BT9 5HT
UK
Person cyswllt: Alex Houston
E-bost: Alex.Houston@nienetworks.co.uk
NUTS: UKN
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.nienetworks.co.uk
I.6) Prif weithgaredd
Trydan
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
C123 (2021) Supply of Air Break Switch Disconnectors
Cyfeirnod: C123 (2021)
II.1.2) Prif god CPV
31214200
II.1.3) Y math o gontract
Cyflenwadau
II.1.4) Disgrifiad byr
The contracting entity intends to establish a framework arrangement under which it shall appoint economic operators to enter into separate framework agreements in respect of the Supply of Air Break Switch Disconnectors. Framework agreements awarded will be for a period of five (5) years, subject to satisfactory performance review, with an option, entirely at the discretion of the contracting entity, to extend by a further optional period of up to three (3) years, with a total potential duration of eight (8) years.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Ydy
II.1.7) Cyfanswm gwerth y caffaeliad
Gwerth heb gynnwys TAW: 3 300 000.00 GBP
II.2) Disgrifiad
Rhif y Lot 1
II.2.1) Teitl
Supply of Air Break Switch Disconnectors — Overhead Lines
II.2.2) Cod(au) CPV ychwanegol
31214200
II.2.3) Man cyflawni
Cod NUTS:
UKN
Prif safle neu fan cyflawni:
NORTHERN IRELAND.
II.2.4) Disgrifiad o’r caffaeliad
The contracting entity intends to establish a framework arrangement under which it shall appoint an economic operator to enter into a framework agreement in respect of the Supply of Air Break Switch Disconnectors — Overhead Lines. The framework agreement will be for a period of five (5) years, subject to satisfactory performance review, with an option, entirely at the discretion of the contracting entity, to extend by a further optional period of up to three (3) years, with a total potential duration of eight (8) years.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
The framework agreement will be for a period of five (5) years with an option, exercisable entirely at the discretion of the contracting entity and subject to the terms of the framework agreement, to extend by a further optional period of up to three (3) years, with a total potential duration of eight (8) years.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Rhif y Lot 2
II.2.1) Teitl
Supply of Air Break Switch Disconnectors — Substations
II.2.2) Cod(au) CPV ychwanegol
31214200
II.2.3) Man cyflawni
Cod NUTS:
UKN
Prif safle neu fan cyflawni:
NORTHERN IRELAND.
II.2.4) Disgrifiad o’r caffaeliad
The contracting entity intends to establish a framework arrangement under which it shall appoint an economic operator to enter into a framework agreement in respect of the Supply of Air Break Switch Disconnectors — Substations. The framework agreement will be for a period of five (5) years, subject to satisfactory performance review, with an option, entirely at the discretion of the contracting entity, to extend by a further optional period of up to three (3) years, with a total potential duration of eight (8) years.
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Ydy
Disgrifiad o’r opsiynau:
The framework agreement will be for a period of five (5) years with an option, exercisable entirely at the discretion of the contracting entity and subject to the terms of the framework agreement, to extend by a further optional period of up to three (3) years, with a total potential duration of eight (8) years.
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
negodi gyda galwad am gystadleuaeth
IV.1.3) Gwybodaeth am gytundeb fframwaith neu system brynu ddynamig
Mae'r broses gaffael yn golygu sefydlu cytundeb fframwaith gydag un gweithredwr.
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2019/S 212-521169
Section V: Dyfarnu contract
Rhif y Lot: 1
Rhif Contract: C123 (2021)
Teitl: Supply of Air Break Switch Disconnectors — Overhead Lines
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
28/03/2021
V.2.2) Gwybodaeth am dendrau
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Clydesdale Ltd
01487710
Instal House, 3 Sunbeam Road, Kempston
Bedford
MK42 7BZ
UK
NUTS: UK
BBaCh yw’r contractwr:
Ydy
V.2.5) Gwybodaeth am is-gontractio
Section V: Dyfarnu contract
Rhif y Lot: 2
Rhif Contract: C123 (2021)
Dyfernir contract/lot:
Ydy
V.2 Dyfarnu contract
V.2.1) Y dyddiad y daeth y contract i ben
28/03/2021
V.2.2) Gwybodaeth am dendrau
Dyfarnwyd y contract i gr?p o weithredwyr economaidd:
Na
V.2.3) Enw a chyfeiriad y contractwr
Morris Line Engineering Ltd
11769911
Novomatic House South Road, Bridgend Industrial Estate
Bridgend
CF31 3EB
UK
NUTS: UK
BBaCh yw’r contractwr:
Ydy
V.2.5) Gwybodaeth am is-gontractio
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Northern Ireland Electricity Networks Ltd
120 Malone Road
Belfast
BT9 5HT
UK
VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu
High Court of Justice in Northern Ireland
Royal Courts of Justice, Chichester Street
Belfast
BT1 3JY
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
28/04/2021