SF03 Hysbysiad Dyfarnu Contract - Cyflenwr(wyr) Llwyddiannus

TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification

  • Cyhoeddwyd gyntaf: 05 Mai 2023
  • Wedi'i addasu ddiwethaf: 05 Mai 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-131228
Cyhoeddwyd gan:
Transport for Wales
ID Awudurdod:
AA50685
Dyddiad cyhoeddi:
05 Mai 2023
Dyddiad Cau:
-
Math o hysbysiad:
SF03 Hysbysiad Dyfarnu Contract - Cyflenwr(wyr) Llwyddiannus
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Yndi

Crynodeb

The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works. The overarching deliverables for the works are: - Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites. - Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations. - Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint. - Procurement of materials required for construction of OLE system. - Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section. The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works: - Final Registration of Queen Street North route section by 23/10/2023 - Final Registration of Bay route section by 15/06/2023 - Final Registration of Rhymney route section by 01/05/24 Specific OLE deliverables include, but are not limited to the design and construction of: - Foundation Installation – Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles. - Mast Installation – single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts. - Booms. - Ties, struts and small part steel including tensioning system etc - Switching including platforms as required - Wiring. - Final registration. CPV: 45234100, 45234100.

Testun llawn y rhybydd

Hysbysiad dyfarnu contract

Canlyniadau'r weithdrefn gaffael

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Transport for Wales

3 Llys Cadwyn, Taff Street

Pontypridd

CF37 4TH

UK

Ffôn: +44 2921673434

E-bost: TFW.Procurement@tfwrail.wales

NUTS: UKL

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: http://www.tfwrail.wales

Cyfeiriad proffil y prynwr: https://www.sell2wales.gov.wales/search/Search_AuthProfile.aspx?ID=AA50685

I.2) Caffael ar y cyd

Caiff y contract ei ddyfarnu gan gorff prynu canolog

I.4) Y math o awdurdod contractio

Corff a lywodraethir gan gyfraith gyhoeddus

I.5) Prif weithgaredd

Arall: Rail

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

TfW Core Valley Lines Transformation - Rhymney Valley, Coryton and Bay Lines Electrification

II.1.2) Prif god CPV

45234100

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

The CVL Transformation programme of works forms an important part of the South Wales Metro and includes an ambitious and extensive range of rail works including electrification of circa 170km of track, new stations, major refurbishment / extension of stations and associated ancillary works.

The overarching deliverables for the works are:

- Establish and manage a materials distribution center (MDC) within a locality of the works which facilitates storage and expeditious delivery of materials to the worksites.

- Provision of a comprehensive materials quality control & material management system which can, but not be limited to the following functions: receive inputs (AFC designs, bills of materials, programme dates, track all stages of installation and associated quality checks and the like), take cognisance of stock levels, produce outputs (material order details) and align material allocations to site locations.

- Establish and provide a team of subject matter experts to undertake detailed design and manage the works from works delivery and contract administration standpoint.

- Procurement of materials required for construction of OLE system.

- Delivery of a full OLE system from foundations to final registration for 13.205 single track kilometers (STK) on the Queen Street North route section, 1.5 STK on the Bay route section, and 45.555 STK on the Rhymney route section.

The works that form the basis of this procurement event are partly funded by European Regional Development Funds (ERDF) resulting in prescriptive dates by which the ERDF monies must be expended. This therefore dictates the following completion dates for the works:

- Final Registration of Queen Street North route section by 23/10/2023

- Final Registration of Bay route section by 15/06/2023

- Final Registration of Rhymney route section by 01/05/24

Specific OLE deliverables include, but are not limited to the design and construction of:

- Foundation Installation – Circular Hollow Sections (CHS) piles, auger piles, concrete pads, plunge piles.

- Mast Installation – single track cantilever masts, self-supporting anchor masts, twin track cantilever masts, portal masts.

- Booms.

- Ties, struts and small part steel including tensioning system etc

- Switching including platforms as required

- Wiring.

- Final registration.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.1.7) Cyfanswm gwerth y caffaeliad

Gwerth heb gynnwys TAW: 38 000 000.00 GBP

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

45234100

II.2.3) Man cyflawni

Cod NUTS:

UKL

II.2.4) Disgrifiad o’r caffaeliad

Design and installation of Overhead Line Equipment for the electrification of rail lines in Wales.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Quality / Pwysoliad: 35%

Price / Pwysoliad:  65%

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Ydy

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2022/S 180-510896

Section V: Dyfarnu contract

Dyfernir contract/lot: Ydy

V.2 Dyfarnu contract

V.2.1) Y dyddiad y daeth y contract i ben

31/03/2023

V.2.2) Gwybodaeth am dendrau

Nifer y tendrau a ddaeth i law: 1

Nifer y tendrau a ddaeth i law gan BBaChau: 0

Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau yr UE: 0

Nifer y tendrau a dderbyniwyd gan dendrwyr o Aelod-wladwriaethau nad ydynt yn aelodau o'r UE: 1

Nifer y tendrau a ddaeth i law drwy ddulliau electronig: 1

Dyfarnwyd y contract i gr?p o weithredwyr economaidd: Na

V.2.3) Enw a chyfeiriad y contractwr

Amey Rail Limited

10 Furnival Street

London

EC4A1AB

UK

Ffôn: +44 7718168421

NUTS: UK

BBaCh yw’r contractwr: Na

V.2.4) Gwybodaeth am werth y contract/lot (heb gynnwys VAT)

Cyfanswm gwerth y contract/lot: 38 000 000.00 GBP

V.2.5) Gwybodaeth am is-gontractio

Section VI: Gwybodaeth ategol

VI.3) Gwybodaeth ychwanegol

(WA Ref:131228)

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

High Court

Royal Courts of Justice, The Strand

London

WC2A 2LL

UK

Ffôn: +44 2079477501

VI.5) Dyddiad anfon yr hysbysiad hwn

03/05/2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45234100 Gwaith adeiladu rheilffyrdd Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau

Lleoliadau Dosbarthu

ID Disgrifiad
1022 Caerdydd a Bro Morgannwg
1015 Cymoedd Canalog (Merthyr Tudful, Rhondda Cynon Taf)

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
TFW.Procurement@tfwrail.wales
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.