Hysbysiad o Gontract

Concrete Repairs to Suspended Concrete Quay, Wisbech Port, Cambridgeshire

  • Cyhoeddwyd gyntaf: 10 Mai 2023
  • Wedi'i addasu ddiwethaf: 10 Mai 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-03c725
Cyhoeddwyd gan:
Fenland District Council
ID Awudurdod:
AA33952
Dyddiad cyhoeddi:
10 Mai 2023
Dyddiad Cau:
06 Mehefin 2023
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Background Information

Fenland District Council (FDC) is the competent Harbour Authority with ownership responsibilities for the Wisbech Port Commercial Estate, including the Reinforced Concrete Suspended Quay. The Suspended Quay consists of a reinforced concrete superstructure formed of longitudinal edge beams and a continuous deck slab spanning between transverse beams. Precast (PC) piles support the quay along transverse beams and roadside longitudinal beams.

The majority (typical section) of the quay is 10.9m wide and approximately 827m long, divided into nine sections with expansion joints at approximately 92m spacing.

The suspended quay incorporates three shipping berths, two of which are located at the Town Quay berth and are incorporated within the works area. The suspended quay is used by the Port of Wisbech to load and unload cargo from visiting vessels and for storage of goods in transit. The suspended quay forms an active part of an operational port and therefore consideration will need to be given to programming and co-ordinating the works and facilitating vehicle access past the works where possible with the minimum amount of disruption.

The Contractor shall determine if it is viable for one of the shipping berths to remain operational during the works without comprising the health & safety of their own or the port operator’s workforce, whilst not impacting on the Clients programme requirements. Co-ordinating and undertaking certain elements of the works during neap tide times when the port is less active will reduce both health & safety risk and disruption.

Following a recent detailed concrete condition survey being undertaken by Nicholls Colton, the Councils appointed structural engineers recommended that works to sections of the quay structure, highlighted as “Red – were to be undertaken within a two year period and by November 2023.

The proposed works:-

The works comprise of removing defective concrete areas, exposing and treating the existing steelwork and undertaking concrete repairs to both horizontal and vertical faces for approximately 203 No patches, (30.58m2) and 250 No cracks (1056Lm) on columns, beams and soffits of the suspended quay. It is also considered necessary to install sacrificial anodes for cathodic protection to the patch repairs

It is envisaged that the works to the underside of the commercial quay will need to be undertaken from the top side of the quay using a suitable mobile crane as used for underside of Bridge Deck inspection works between tides, as during the period of High Water access is unlikely.

All specialist contractors must be members of the Concrete Repair Association (CRA), and be conversant with and work to the concrete repair standard covered in BS EN1504.

Testun llawn y rhybydd

Hysbysiad contract

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Fenland District Council

Fenland Hall, County Road

March

PE15 8NQ

UK

Person cyswllt: Mr Shaun Beales

Ffôn: +44 1354622429

E-bost: sbeales@fenland.gov.uk

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.fenland.gov.uk/

Cyfeiriad proffil y prynwr: https://www.fenland.gov.uk/

I.3) Cyfathrebu

Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:

https://procontract.due-north.com/Advert/Index?advertId=673cd38a-58ee-ed11-8122-005056b64545


Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:

https://procontract.due-north.com/Advert/Index?advertId=673cd38a-58ee-ed11-8122-005056b64545


I.4) Y math o awdurdod contractio

Awdurdod rhanbarthol neu leol

I.5) Prif weithgaredd

Gwasanaethau cyhoeddus cyffredinol

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Concrete Repairs to Suspended Concrete Quay, Wisbech Port, Cambridgeshire

Cyfeirnod: DN669307

II.1.2) Prif god CPV

45262300

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

Background Information

Fenland District Council (FDC) is the competent Harbour Authority with ownership responsibilities for the Wisbech Port Commercial Estate, including the Reinforced Concrete Suspended Quay. The Suspended Quay consists of a reinforced concrete superstructure formed of longitudinal edge beams and a continuous deck slab spanning between transverse beams. Precast (PC) piles support the quay along transverse beams and roadside longitudinal beams.

The majority (typical section) of the quay is 10.9m wide and approximately 827m long, divided into nine sections with expansion joints at approximately 92m spacing.

The suspended quay incorporates three shipping berths, two of which are located at the Town Quay berth and are incorporated within the works area. The suspended quay is used by the Port of Wisbech to load and unload cargo from visiting vessels and for storage of goods in transit. The suspended quay forms an active part of an operational port and therefore consideration will need to be given to programming and co-ordinating the works and facilitating vehicle access past the works where possible with the minimum amount of disruption.

The Contractor shall determine if it is viable for one of the shipping berths to remain operational during the works without comprising the health & safety of their own or the port operator’s workforce, whilst not impacting on the Clients programme requirements. Co-ordinating and undertaking certain elements of the works during neap tide times when the port is less active will reduce both health & safety risk and disruption.

Following a recent detailed concrete condition survey being undertaken by Nicholls Colton, the Councils appointed structural engineers recommended that works to sections of the quay structure, highlighted as “Red – were to be undertaken within a two year period and by November 2023.

The proposed works:-

The works comprise of removing defective concrete areas, exposing and treating the existing steelwork and undertaking concrete repairs to both horizontal and vertical faces for approximately 203 No patches, (30.58m2) and 250 No cracks (1056Lm) on columns, beams and soffits of the suspended quay. It is also considered necessary to install sacrificial anodes for cathodic protection to the patch repairs

It is envisaged that the works to the underside of the commercial quay will need to be undertaken from the top side of the quay using a suitable mobile crane as used for underside of Bridge Deck inspection works between tides, as during the period of High Water access is unlikely.

All specialist contractors must be members of the Concrete Repair Association (CRA), and be conversant with and work to the concrete repair standard covered in BS EN1504.

II.1.5) Cyfanswm gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 1 000 000.00 GBP

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

45262310

45262330

45262370

II.2.3) Man cyflawni

Cod NUTS:

UK


Prif safle neu fan cyflawni:

Wisbech, Cambridgeshire.

II.2.4) Disgrifiad o’r caffaeliad

Background Information

Fenland District Council (FDC) is the competent Harbour Authority with ownership responsibilities for the Wisbech Port Commercial Estate, including the Reinforced Concrete Suspended Quay. The Suspended Quay consists of a reinforced concrete superstructure formed of longitudinal edge beams and a continuous deck slab spanning between transverse beams. Precast (PC) piles support the quay along transverse beams and roadside longitudinal beams.

The majority (typical section) of the quay is 10.9m wide and approximately 827m long, divided into nine sections with expansion joints at approximately 92m spacing.

The suspended quay incorporates three shipping berths, two of which are located at the Town Quay berth and are incorporated within the works area. The suspended quay is used by the Port of Wisbech to load and unload cargo from visiting vessels and for storage of goods in transit. The suspended quay forms an active part of an operational port and therefore consideration will need to be given to programming and co-ordinating the works and facilitating vehicle access past the works where possible with the minimum amount of disruption.

The Contractor shall determine if it is viable for one of the shipping berths to remain operational during the works without comprising the health & safety of their own or the port operator’s workforce, whilst not impacting on the Clients programme requirements. Co-ordinating and undertaking certain elements of the works during neap tide times when the port is less active will reduce both health & safety risk and disruption.

Following a recent detailed concrete condition survey being undertaken by Nicholls Colton, the Councils appointed structural engineers recommended that works to sections of the quay structure, highlighted as “Red – were to be undertaken within a two year period and by November 2023.

The proposed works:-

The works comprise of removing defective concrete areas, exposing and treating the existing steelwork and undertaking concrete repairs to both horizontal and vertical faces for approximately 203 No patches, (30.58m2) and 250 No cracks (1056Lm) on columns, beams and soffits of the suspended quay. It is also considered necessary to install sacrificial anodes for cathodic protection to the patch repairs

It is envisaged that the works to the underside of the commercial quay will need to be undertaken from the top side of the quay using a suitable mobile crane as used for underside of Bridge Deck inspection works between tides, as during the period of High Water access is unlikely.

All specialist contractors must be members of the Concrete Repair Association (CRA), and be conversant with and work to the concrete repair standard covered in BS EN1504.

II.2.5) Meini prawf dyfarnu

Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi

II.2.6) Gwerth amcangyfrifedig

Gwerth heb gynnwys TAW: 1 000 000.00 GBP

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 4

Gall y contract hwn gael ei adnewyddu: Na

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Na

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 06/06/2023

Amser lleol: 12:00

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

IV.2.7) Amodau ar gyfer agor tendrau

Dyddiad: 06/06/2023

Amser lleol: 12:00

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

Public Procurement Review Service

London

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

09/05/2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45262330 Gwaith atgyweirio concrit Gwaith adeiladu crefftau arbennig heblaw gwaith toi
45262300 Gwaith concrit Gwaith adeiladu crefftau arbennig heblaw gwaith toi
45262310 Gwaith concrit cyfnerth Gwaith adeiladu crefftau arbennig heblaw gwaith toi
45262370 Gwaith gosod araen concrit Gwaith adeiladu crefftau arbennig heblaw gwaith toi

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
sbeales@fenland.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.