Disgrifiad caffael
You are invited to submit a tender for the replacement of the flat roof on the upper block at Fochriw Primary School. The scope of the project is fully described in Appendix 1 but in summary the scope is:
- Provide and erect fixed scaffolding with built in stairs, hoists for materials, and including additional protection over all maintained entrance/exit and fire escape doors, double boarded fans, kick boards, brick guards on handrails, netting and any post protection padding as may be necessary, etc.
- Flat Roof Renewal on upper block.
- Replace 3NO. high level windows.
- Replace 2NO. roof lanterns. Bauder Euroglaze or similar approved.
- Replace rainwater goods to perimeter of new roof.
- New fascia board.
- All works must be carried out and completed over the summer period between 20th July – 28th August 2026.
- Allow for all necessary protection to roof areas not included in these works.
- Elevations to be fully scaffolded, must include fixed staircase and internal barrier to floor edge.
- Heras anti climb fencing to be erected around the complete perimeter of the scaffolding, a minimum 1-2m outside base of scaffolding, to provide complete segregation between works and building/school users.
- No Doorways, gates or walkways are to be blocked off during the execution of these works without the prior written consent of the contract administrator.
- To the areas noted on drawings A001, A002 & A003 provide and fit new reinforced bitumen membrane warm roof system.
- All to be as the attached specification.