Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
West Sussex County Council
County Hall, West Street
Chichester
PO19 1RQ
UK
Person cyswllt: Neil Robb
E-bost: neil.robb@westsussex.gov.uk
NUTS: UKJ27
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.westsussex.gov.uk/default.aspx
Cyfeiriad proffil y prynwr: https://www.westsussex.gov.uk/default.aspx
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Provision of Solar Photovoltaic (PV) systems and Battery
Cyfeirnod: I-0428
II.1.2) Prif god CPV
45261215
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
This project involves the following activities carried out in phases. In the first phase the Contractor is required to survey and confirm the suitability / viability of the installation of equipment at the Designated Sites in and to price the installation and commissioning and ongoing maintenance of the equipment at that site.
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UKJ27
II.2.4) Disgrifiad o’r caffaeliad
This project involves the following activities carried out in phases. In the first phase the Contractor is required to survey and confirm the suitability / viability of the installation of equipment at the Designated Sites in and to price the installation and commissioning and ongoing maintenance of the equipment at that site.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Quality
/ Pwysoliad: 65
Maen prawf cost: Price
/ Pwysoliad: 35
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2023/S 000-022057
Section V: Dyfarnu contract
Dyfernir contract/lot:
Na
V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu
Ni ddyfernir y contract/lot
Ni ddaeth tendrau na cheisiadau i gymryd rhan i law neu cafodd pob un ei wrthod
Section VI: Gwybodaeth ategol
VI.3) Gwybodaeth ychwanegol
Please note that we have taken the decision not to proceed with this procurement for the following reasons:<br/>(a) The Instructions to Tenderers Document 01 did not stipulate with sufficient clarity that in their pricing of Phase 2 and Phase 3 works at the 5 Designated Sites, tenderers were to price the battery storage capacity specified for each of those Designated Sites as set out in the Asset List (Pricing Schedule Document 09). <br/>(b) The Instructions to Tenderers Document 01 and the Pricing Schedule Document 09 contained contradictory instructions regarding the completion of two tabs within the Pricing Schedule – the Schedule of Rates and the Dayworks Schedule. The obligation to complete all of the cells within these two tabs was unclear and no test of compliance was imposed in relation to the completion of those cells.<br/>As a result of (a) and (b), tenderers did not interpret the instructions in a uniform way and the Council was unable to assess compliance with its instructions or to evaluate bids on a like for like basis in order to identify the Most Economically Advantageous Tender.
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
The High Court
London
London
EC4A 1NL
UK
Cyfeiriad(au) rhyngrwyd
URL: https://www.judiciary.uk/courts-and-tribunals/high-court/
VI.5) Dyddiad anfon yr hysbysiad hwn
24/11/2023