Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Gontract

Architectural Design, Civil & Structural Engineering Services for RIBA Stages 4 – 5A for County Flat

  • Cyhoeddwyd gyntaf: 01 Tachwedd 2024
  • Wedi'i addasu ddiwethaf: 01 Tachwedd 2024
  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Rydych yn gweld hysbysiad sydd wedi dod i ben.

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-145710
Cyhoeddwyd gan:
Tai Tarian Ltd
ID Awudurdod:
AA1087
Dyddiad cyhoeddi:
01 Tachwedd 2024
Dyddiad Cau:
15 Tachwedd 2024
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Yndi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

We are seeking to issue a Contract to a single Supplier (Consultant) for Architectural Design, Civil & Structural Engineering Services for RIBA Stages 4 – 5A as set out in the Scope of Works below, for the redevelopment works at County Flats Phase 2 in Aberavon, Port Talbot. The appointed Consultant will provide a combined consultancy service that comprises of Architectural, Civil Engineer and Structural Engineer services, to develop the existing planning stage design to full design suitable to enter fixed price design and build contract. The lead designer will fully coordinate design with wider design team, to include (but not limited to) building services engineers, energy specialist, fire consultancy, planning consultants, landscape architects, transport engineers and ecologists. The redevelopment works of County Flats Phase 2 in Aberavon, Port Talbot is a major opportunity to regenerate this part of the Aberavon Sea front and provide a landmark scheme that will provide energy efficient new homes, revitalise the public realm and inform potential developments across Wales for decades to come. The main objectives of the scheme are to: - Refurbish the existing 50 flats externally to provide energy efficient homes. - Construct 104 new homes, using modern methods of constructions (“MMC”), to provide energy efficient new homes. The regeneration of County Flats Phase 2 will remain in keeping with the approved scheme on Phase 1. The project works are to comprise of, renew roofs and external appearance of existing blocks, create new infill and replacement blocks. Redevelop landscape areas to create sufficient car parking and high-quality soft landscape areas. The anticipated construction works costs for County Flats Phase 2 is in the region of 21,500,000 GBP. Scope of Works The Scope of Works is to include services generally in accordance with the expectations of the RIBA Plan of Work, as set out below for avoidance of doubt: RIBA Work Stage 4 Technical Design - Develop architectural technical design & specification based on signed off Work Stage 3 design. - Prepare architectural information for discharge of planning conditions (via planning consultant). - Prepare architectural information for Building Regulations submission. - Prepare engineering information for Section 38, 104, and 278/111. - Prepare necessary information and submit full SAB application. - Secure all necessary approvals to allow start on site. - Develop structural engineering design for: foundations, superstructure and refurbishment elements such that costs can be fixed during tender period. - Attend all team meetings. - Assist in selection of main contractor. RIBA Work Stage 5A Manufacturing & Construction PRE-CONTRACT - Undertake review of design with any preferred /shortlisted contractors. - Test value engineering opportunities with contractors. - Prepare any supplementary construction details deemed necessary as part of pre contract period. RIBA Work Stage 5B Manufacturing & Construction POST CONTRACT - Any costs for consultancy services post contract shall be agreed directly with the main contractor.

Testun llawn y rhybydd

HYSBYSIAD O GONTRACT - CENEDLAETHOL

SERVICES

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Tai Tarian Ltd

Ty Gwyn, Brunel Way, Baglan Energy Park,

Neath

SA11 2FP

UK

Procurement

+44 1639505890

procurement@taitarian.co.uk

http://www.taitarian.co.uk
http://www.sell2wales.gov.wales
http://www.sell2wales.gov.wales

1.2

Cyfeiriad ar gyfer cael dogfennaeth

Fel yn I.1

1.3

Mae'n rhaid dychwelyd dogfennau wedi'u cwblhau at:

Fel yn I.1

2 Manylion y Contract

2.1

Teitl

Architectural Design, Civil & Structural Engineering Services for RIBA Stages 4 – 5A for County Flat

2.2

Disgrifiad o'r nwyddau neu'r gwasanaethau sydd eu hangen

We are seeking to issue a Contract to a single Supplier (Consultant) for Architectural Design, Civil & Structural Engineering Services for RIBA Stages 4 – 5A as set out in the Scope of Works below, for the redevelopment works at County Flats Phase 2 in Aberavon, Port Talbot.

The appointed Consultant will provide a combined consultancy service that comprises of Architectural, Civil Engineer and Structural Engineer services, to develop the existing planning stage design to full design suitable to enter fixed price design and build contract.

The lead designer will fully coordinate design with wider design team, to include (but not limited to) building services engineers, energy specialist, fire consultancy, planning consultants, landscape architects, transport engineers and ecologists.

The redevelopment works of County Flats Phase 2 in Aberavon, Port Talbot is a major opportunity to regenerate this part of the Aberavon Sea front and provide a landmark scheme that will provide energy efficient new homes, revitalise the public realm and inform potential developments across Wales for decades to come.

The main objectives of the scheme are to:

- Refurbish the existing 50 flats externally to provide energy efficient homes.

- Construct 104 new homes, using modern methods of constructions (“MMC”), to provide energy efficient new homes.

The regeneration of County Flats Phase 2 will remain in keeping with the approved scheme on Phase 1. The project works are to comprise of, renew roofs and external appearance of existing blocks, create new infill and replacement blocks. Redevelop landscape areas to create sufficient car parking and high-quality soft landscape areas.

The anticipated construction works costs for County Flats Phase 2 is in the region of 21,500,000 GBP.

Scope of Works

The Scope of Works is to include services generally in accordance with the expectations of the RIBA Plan of Work, as set out below for avoidance of doubt:

RIBA Work Stage 4 Technical Design

- Develop architectural technical design & specification based on signed off Work Stage 3 design.

- Prepare architectural information for discharge of planning conditions (via planning consultant).

- Prepare architectural information for Building Regulations submission.

- Prepare engineering information for Section 38, 104, and 278/111.

- Prepare necessary information and submit full SAB application.

- Secure all necessary approvals to allow start on site.

- Develop structural engineering design for: foundations, superstructure and refurbishment elements such that costs can be fixed during tender period.

- Attend all team meetings.

- Assist in selection of main contractor.

RIBA Work Stage 5A Manufacturing & Construction PRE-CONTRACT

- Undertake review of design with any preferred /shortlisted contractors.

- Test value engineering opportunities with contractors.

- Prepare any supplementary construction details deemed necessary as part of pre contract period.

RIBA Work Stage 5B Manufacturing & Construction POST CONTRACT

- Any costs for consultancy services post contract shall be agreed directly with the main contractor.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=145710.

The buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx.

Suppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.

2.3

Cod a Dosbarthiad yr Hysbysiad

71200000 Architectural and related services
71310000 Consultative engineering and construction services
1017 Bridgend and Neath Port Talbot

2.4

Cyfanswm maint neu gwmpas y tendr

The Contract will be awarded to a single Supplier, to be carried out over a period of circa 18 months, until contract stage of the works contract for County Flats Phase 2, which is expected to be no later than March 2026.

The estimated whole-life value of the Contract is 100,000 GBP.

3 Amodau ar gyfer Cymryd Rhan

3.1

Safonau gofynnol a'r cymhwyster sydd ei angen

4 Gwybodaeth Weinyddol

4.1

Math o Weithdrefn

Un cam

4.2

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

00996

4.3

Terfynau Amser



Terfyn amser ar gyfer derbyn tendrau wedi'u cwblhau
     15 - 11 - 2024  Amser   12:00

Dyddiad dyfarnu amcangyfrifedig   25 - 11 - 2024

4.5

Yr iaith neu'r ieithoedd y gellir ei/eu defnyddio i lunio tendrau neu geisiadau i gymryd rhan

EN  

4.6

Blwch Postio Cyflwyno Tendrau

Mae'r awdurdod dyfarnu wedi nodi y bydd yn derbyn ymatebion electronig i'r hysbysiad hwn drwy'r Blwch Postio Cyflwyno Tendrau. Mae rhagor o fanylion ar gael yn https://www.sell2wales.gov.wales/sitehelp/help_guides.aspx

5 Gwybodaeth Arall

5.1

Gwybodaeth Ychwanegol

(WA Ref:145710)

Under the terms of this contract the successful supplier(s) will be required to deliver Community Benefits in support of the authority’s economic and social objectives. Accordingly, contract performance conditions may relate in particular to social and environmental considerations. The Community Benefits included in this contract are:

It’s Tai Tarian’s intention that the delivery of the Contract assists in the achievement of their commitment towards community benefits as outlined in Tai Tarian’s Community Benefits Policy.

It is the approach of Tai Tarian to maximise local reinvestment through the creation of jobs and training and through supporting the local supply chain. This approach is defined by:

1. Think Neath Port Talbot

2. Think Swansea Bay City Region Deal Area (Neath Port Talbot, Swansea, Carmarthenshire, Pembrokeshire)

3. Think Wales

It is a contract condition that the consultant delivers community benefits as part of this Contract.

Tenderers must not outline the community benefit’s they are currently delivering for existing Clients.

Tenderers must outline what they propose to offer for Tai Tarian if awarded the Contract by completing Appendix 3 - Community Benefits Obligations.

For further information on how community benefits will be evaluated, please refer to 16. The Process – Tender Award Stage.

Delivery of community benefits through all spend is aligned with the Well-being of Future Generations Act Wales and delivers against its goals.

The buyer considers that this contract is suitable for consortia bidding.

5.2

Dogfennaeth Ychwanegol

ITT - Architectural Design, Civil & Structural Engineering Services for RIBA Stages 4 – 5A for County Flats Phase 2 – 00996

5.3

Dyddiad cyhoeddi'r hysbysiad hwn

  01 - 11 - 2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
71200000 Gwasanaethau pensaernïol a gwasanaethau cysylltiedig Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio
71310000 Gwasanaethau ymgynghorol ar gyfer peirianneg ac adeiladu Gwasanaethau peirianneg

Lleoliadau Dosbarthu

ID Disgrifiad
1017 Pen-y-bont ar Ogwr a Castell-Nedd Port Talbot

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
procurement@taitarian.co.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
07/11/2024 15:52
ADDED FILE: Stage 3 Drawings
Stage 3 Drawings
07/11/2024 15:52
REPLACED FILE: ITT - Architectural Design, Civil...BA Stages 4 – 5A for County Flats Phase 2 – 00996
Invitation to Tender - updated 07.11.2024
07/11/2024 15:55
Updated ITT - 07.11.2024
To all Tenderers, please note that the ITT has been updated on 07.11.2024 and this new version has replaced the previous ITT on the documentation section. All Tenderers are expected to download this ITT and submit their tender in accordance with the updated ITT. For ease, the following updates have been made to the ITT:
- tender brief with additional information on EPC A.
- tender brief with main objectives of the scheme.
- minimum insurance requirements to question B5 of the Tender Selection Stage in relation to a minimum Professional Indemnity Insurance.

Blwch Post

Mae'r awdurdod dyfarnu wedi nodi y bydd yn derbyn ymatebion electronig i'r hysbysiad hwn drwy'r Blwch Postio Cyflwyno Tendrau.

Cyflwyno eich ymateb i'r tendr yn electronig mewn amgylchedd diogel.

Er mwyn creu ymateb electronig, cliciwch ar y botwm "Ychwanegu at fy rhestr Diddordeb" ar frig y dudalen.

Am ragor o wybodaeth am y Blwch Postio, darllenwch y canllaw i ddefnyddwyr:

Cwestiynau ac Atebion

Gofyn unrhyw gwestiynau y gall fod gennych ynghylch yr hysbysiad hwn i'r prynwr. Er mwyn gofyn cwestiwn neu gwestiynau i'r prynwr cliciwch ar y botwm "Gweld Cwestiynau ac Atebion".

Dogfennau Ychwanegol

Mae'r dogfennau ychwanegol canlynol wedi'u hatodi i'r hysbysiad hwn. I gael y dogfennau hyn, dewiswch enwau'r ffeiliau unigol isod.

Dogfennau cyfredol

zip
zip1.95 MB
Gofyn am fformat gwahanol.

Dogfennau wedi'u disodli


0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.