Hysbysiad o Ddyfarnu Contract

Natures Wardens - Green Roof Structure

  • Cyhoeddwyd gyntaf: 06 Tachwedd 2025
  • Wedi'i addasu ddiwethaf: 06 Tachwedd 2025
  • Fersiwn: N/A
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Eicon Gwybodaeth

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-155484
Cyhoeddwyd gan:
Neath Port Talbot County Borough Council
ID Awudurdod:
AA0274
Dyddiad cyhoeddi:
06 Tachwedd 2025
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

An award has been made by Neath Port Talbot County Borough Council to appoint the services of a contractor, to deliver a green roof summer house as part of its ‘Nature’s Wardens’ collaborative project with the Mid and West Wales Fire Services (MWWFS). PROJECT TIMESCALE: The Council are looking for a suitable contractor to complete the works, as detailed below, within an anticipated timescale of 31st December 2025. CONTRACT REQUIREMENTS: The construction of a timber summer house able to support a wildflower green roof including the necessary ground preparation works. The installation and specifications are expected to meet all relevant CDM Regulations and standards, fire regulations (BS EN 13501-1) and health and safety regulations. The project aims to demonstrate good practice; is multifunctional; supports local flora and fauna; contributes positively to the removal of air pollution; deals with excess rainwater and improves the overall look and feel around the fire station. This project could potentially inform future development within Neath Port Talbot county borough and should therefore be easily maintained and replicable. The contractor will be required to complete the works following the elements described below: 1. Working closely with the Green Infrastructure and Biodiversity team, the contractor will construct and install a green roof summer house. Plant selection to be pre-agreed with Green Infrastructure and Biodiversity teams 2. Working closely with MWWFS and the council, the contractor will be required to comply with any relevant CDM Regulations and consider the required need for future inspection and maintenance of the structure. 3. The contractor will be required to ensure that the summer house is watertight and able to support the saturated weight of a green roof. 4. To ensure the success and longevity of this project, the contractor will need to include a maintenance programme (inclusive of plant replacement and watering) for the first 12 months following installation. Knowledge and/or experience in Green Infrastructure and the delivery of a similar project/s is essential. DELIVERABLES: The contractor will be expected to: 1. Construct a green roof summer house including native, wildflower planting. All features to include the provision and planting of plants 2. Evidence that CDM Regulations, building standards, fire regulations and relevant legislation in relation to the nature of the structure have been followed 3. A 12-month maintenance programme post installation to ensure the successful establishment of the plants as well as making sure the installed structure is watertight, safe and fully functioning 4. Completion of the works anticipated to take place before or on 31st December 2025 with a defect correction period of 12 months post completion.

Testun llawn y rhybydd

HYSBYSIAD O DDYFARNU CONTRACT - CENEDLAETHOL

SERVICES

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Neath Port Talbot County Borough Council

The Quays, Brunel Way,

Baglan

SA11 2GG

UK

Marie Fowler

+44 7890893134

m.fowler@npt.gov.uk

http://www.npt.gov.uk

2 Manylion y Contract

2.1

Teitl

Natures Wardens - Green Roof Structure

2.2

Disgrifiad o'r contract

An award has been made by Neath Port Talbot County Borough Council to appoint the services of a contractor, to deliver a green roof summer house as part of its ‘Nature’s Wardens’ collaborative project with the Mid and West Wales Fire Services (MWWFS).

PROJECT TIMESCALE:

The Council are looking for a suitable contractor to complete the works, as detailed below, within an anticipated timescale of 31st December 2025.

CONTRACT REQUIREMENTS:

The construction of a timber summer house able to support a wildflower green roof including the necessary ground preparation works. The installation and specifications are expected to meet all relevant CDM Regulations and standards, fire regulations (BS EN 13501-1) and health and safety regulations. The project aims to demonstrate good practice; is multifunctional; supports local flora and fauna; contributes positively to the removal of air pollution; deals with excess rainwater and improves the overall look and feel around the fire station. This project could potentially inform future development within Neath Port Talbot county borough and should therefore be easily maintained and replicable.

The contractor will be required to complete the works following the elements described below:

1. Working closely with the Green Infrastructure and Biodiversity team, the contractor will construct and install a green roof summer house. Plant selection to be pre-agreed with Green Infrastructure and Biodiversity teams

2. Working closely with MWWFS and the council, the contractor will be required to comply with any relevant CDM Regulations and consider the required need for future inspection and maintenance of the structure.

3. The contractor will be required to ensure that the summer house is watertight and able to support the saturated weight of a green roof.

4. To ensure the success and longevity of this project, the contractor will need to include a maintenance programme (inclusive of plant replacement and watering) for the first 12 months following installation.

Knowledge and/or experience in Green Infrastructure and the delivery of a similar project/s is essential.

DELIVERABLES:

The contractor will be expected to:

1. Construct a green roof summer house including native, wildflower planting. All features to include the provision and planting of plants

2. Evidence that CDM Regulations, building standards, fire regulations and relevant legislation in relation to the nature of the structure have been followed

3. A 12-month maintenance programme post installation to ensure the successful establishment of the plants as well as making sure the installed structure is watertight, safe and fully functioning

4. Completion of the works anticipated to take place before or on 31st December 2025 with a defect correction period of 12 months post completion.

2.3

Cod a Dosbarthiad yr Hysbysiad

03419100 Timber products
45112710 Landscaping work for green areas
45112713 Landscaping work for roof gardens
45262640 Environmental improvement works
77310000 Planting and maintenance services of green areas
1017 Bridgend and Neath Port Talbot

2.4

Amcangyfrif o Gyfanswm Gwerth

3 Gweithdrefn

3.1

Math o Weithdrefn

Un cam

4 Dyfarnu Contract

4.1

Cynigwyr Llwyddiannus

4.1.1

Enw a Chyfeiriad y cyflenwr, contractwr neu ddarparwr gwasanaeth llwyddiannus





Stafford Construction Ltd.

107 Bethania Street, Maesteg,

Mid Glamorgan

CF349EX

UK




5 Gwybodaeth Arall

5.1

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

N/a

5.2

Dyddiad Dyfarnu'r Contract

  17 - 10 - 2025

5.3

Nifer y tendrau a dderbyniwyd

2

5.4

Gwybodaeth Arall

(WA Ref:157829)

5.5

Dogfennaeth Ychwanegol

Dd/g

5.6

Dyddiad cyhoeddi'r hysbysiad hwn:

  06 - 11 - 2025

Codio

Categorïau nwyddau

ID Teitl Prif gategori
03419100 Cynhyrchion pren Coed
45262640 Gwaith gwella amgylcheddol Gwaith adeiladu crefftau arbennig heblaw gwaith toi
45112713 Gwaith tirlunio ar gyfer gerddi to Gwaith cloddio a symud pridd
45112710 Gwaith tirlunio ar gyfer mannau gwyrdd Gwaith cloddio a symud pridd
77310000 Gwasanaethau plannu a chynnal a chadw mannau gwyrdd Gwasanaethau garddwriaethol

Lleoliadau Dosbarthu

ID Disgrifiad
1017 Pen-y-bont ar Ogwr a Castell-Nedd Port Talbot

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Teulu dogfennau

Manylion hysbysiad
Dyddiad cyhoeddi:
09 Medi 2025
Dyddiad Cau:
08 Hydref 2025 00:00
Math o hysbysiad:
Hysbysiad o Gontract
Enw Awdurdod:
Neath Port Talbot County Borough Council
Dyddiad cyhoeddi:
06 Tachwedd 2025
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Enw Awdurdod:
Neath Port Talbot County Borough Council

Ynglŷn â'r prynwr

Prif gyswllt:
m.fowler@npt.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.