HYSBYSIAD O DDYFARNU CONTRACT - CYFNODOLYN SWYDDOGOL
|
Adran I: Awdurdod Contractio
|
I.1)
|
Enw, Cyfeiriad a Phwynt(iau) Cyswllt
|
|
Cell Therapy Catapult |
12th Floor, Guy's Tower, Great Maze Pond |
London |
SE1 9RT |
UK |
Lisa Slade |
|
ojeu@ct.catapult.org.uk |
|
http://catapult.org.uk/celltherapy
|
|
I.2)
|
Math o Awdurdod contractio a'i Brif Weithgaredd neu Weithgareddau
|
|
Na
|
Adran II: Amcan y Contract
|
II.1)
|
Disgrifiad
|
II.1.1)
|
Teitl a roddwyd i'r contract gan yr awdurdod contractio
Supply of Construction Services for the Cell Therapy Catapult Manufacturing Centre.
|
II.1.2(a))
|
Math o gontract gwaith
|
II.1.2(b))
|
Math o gontract cyflenwadau
|
II.1.2(c))
|
Math o gontract gwasanaeth
|
II.1.2)
|
Prif safle neu leoliad y gwaith, man cyflawni neu berfformio
Stevenage. UKH2 |
II.1.3)
|
Mae'r hysbysiad hwn yn ymwneud â chytundeb fframwaith
|
II.1.4)
|
Disgrifiad byr o'r contract neu'r pryniant/pryniannau
The Cell Therapy Catapult has received government funding to establish a large-scale Cell Therapy Manufacturing Centre in the UK. Currently, UK manufacturing is currently served by mainly small academic centres that are designed to provide material for early stage clinical trials. There is currently no large-scale infrastructure in the UK that would enable the manufacture of cell therapies for late stage, Phase III manufacturing and subsequently for in-market supply.
The lack of suitable capacity will be both an obstacle to the development of the industry and is a key gap in the infrastructure that will allow long-term value to be captured for the UK.
The large-scale Cell Therapy Manufacturing Centre will ensure the availability of manufacturing capacity in the UK for the supply of Phase III clinical trial material and ultimately enable in-market supply. It will be the model for future expansion of the Cell Therapy Manufacturing industry and form the critical mass that will enable the development of the UK industry and make the UK, the go to place for manufacturing in Europe.
The design for the Manufacturing Centre is still being developed but is likely to be in the order of 7 500 m2 and include Grade B Clean Rooms, manufacturing support and administration space.
|
II.1.5)
|
Geirfa Gaffael Gyffredin (CPV)
|
|
|
|
45000000 |
|
|
|
|
|
II.1.6)
|
Contract wedi'i gwmpasu gan gytundeb caffael y llywodraeth (GPA)
Na
|
II.2)
|
Cyfanswm gwerth terfynol y contract(au)
|
II.2.1)
|
Cyfanswm gwerth terfynol y contract(au)
|
Adran IV: Gweithdrefn
|
IV.1)
|
Math o weithdrefn
|
IV.1.1)
|
Math o weithdrefn
|
IV.2)
|
Meini prawf dyfarnu
|
IV.2.1)
|
Meini prawf dyfarnu
|
|
|
|
Technical |
60 |
|
Price |
40 |
|
IV.2.2)
|
Defnyddiwyd arwerthiant electronig
Na
|
IV0.3)
|
Gwybodaeth weinyddol
|
IV.3.1)
|
Rhif cyfeirnod ffeil a roddwyd gan yr awdurdod contractio
CON-0058
|
IV.3.2)
|
Cyhoeddiad(au) blaenorol sy'n ymwneud â'r un contract
2015/S 29-048151
11
- 02
- 2015
2015/S 38-064262
24
- 02
- 2015
Cyhoeddiadau blaenorol eraill
|
Adran V: Dyfarnu contract
|
|
|
V.1)
|
Dyddiad dyfarnu'r contract:
02
- 09
- 2015 |
V.2)
|
Nifer y cynigion a dderbyniwyd:
4 |
V.3)
|
Enw a chyfeiriad y gweithredwr economaidd y dyfarnwyd y contract iddo
M+W High Tech Projects Ltd |
|
Chippenham |
SN14 0GT |
UK |
|
|
|
|
|
V.4)
|
Gwybodaeth am werth y contract
|
V.5)
|
Mae'r contract yn debygol o gael ei is-gontractio
Ie
|
|
Disgrifiad byr o werth/cyfran y contract sy'n debygol o gael ei is-gontractio
|
Adran VI: Gwybodaeth Ategol
|
VI.1)
|
A yw'r contract yn ymwneud â phrosiect a/neu raglen a ariennir gan gronfeydd cymunedol?
Na
|
VI.2)
|
Gwybodaeth Ychwanegol
|
VI.3)
|
Gweithdrefnau ar gyfer apelio
|
VI.3.1)
|
Corff sy'n gyfrifol am y gweithdrefnau apelio
Cell Therapy Catapult |
|
London |
SE1 9RT |
|
ojeu@ct.catapult.org.uk |
|
|
|
|
|
Corff sy'n gyfrifol am y gweithdrefnau cyfryngu
|
|
|
|
|
|
|
|
|
|
VI.3.2)
|
Cyflwyno apeliadau
|
VI.3.3)
|
Gwasanaeth y gellir cael gwybodaeth ynglŷn â chyflwyno apeliadau oddi wrtho
|
|
|
|
|
|
|
|
|
|
VI.4)
|
Dyddiad yr anfonwyd yr Hysbysiad hwn
12
- 10
- 2015 |