Hysbysiad contract
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
LGSS Procurement on behalf of Cambridgeshire County Council
Shire Hall, Castle Hill
Cambridge
CB3 0AP
UK
Person cyswllt: Mr Jon Collyns
Ffôn: +44 1223715353
E-bost: jon.collyns@cambridgeshire.gov.uk
NUTS: UKH12
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.lgss.co.uk/about/
Cyfeiriad proffil y prynwr: https://www.lgss.co.uk/about/
I.2) Caffael ar y cyd
Caiff y contract ei ddyfarnu gan gorff prynu canolog
I.3) Cyfathrebu
Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:
https://procontract.due-north.com/Opportunities/Index?p=4d8cb5a5-74dc-e511-810e-000c29c9ba21&v=1
Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod
Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:
https://procontract.due-north.com/Register
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Cambridgeshire County Council A605 Kings Dyke Level Crossing Closure
Cyfeirnod: DN424702
II.1.2) Prif god CPV
45000000
II.1.3) Y math o gontract
Gwaith
II.1.4) Disgrifiad byr
Cambridgeshire County Council require a design and build contractor to design and construct the scheme. The scheme was previously awarded as a 2 stage D&B and the full detailed design has been completed, however the costs increased so it has been decided to go back to the open market.
This procurement is not divided into lots, as the authority requires one single lead provider to be awarded this contract, utilising their supply chain as required.
II.1.5) Cyfanswm gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 15 800 000.00 GBP
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.2) Cod(au) CPV ychwanegol
44000000
II.2.3) Man cyflawni
Cod NUTS:
UKH12
II.2.4) Disgrifiad o’r caffaeliad
The authority wishes to appoint a provider for design and construction to bypass the level crossing at King’s Dyke, Whittlesey. The works will include 1 km of new road on structural embankments, a new bridge over the railway and accommodating works. The scheme was previously awarded as a 2 stage design and build contract, for which a detailed design was completed. Cost estimates increased over time and so the authority is now seeking improved outcomes from the market.
The provider will be required to take responsibility for the existing detailed design, but may seek approval from the authority as to where it may be improved. The authority therefore welcomes value engineering exercises from the provider but notes that existing planning consent, site and technical constraints must be all upheld in any proposals which may come forward. Non-material amendments may be considered.
It is expected that a contract will last for a period of approximately 2 years.
II.2.5) Meini prawf dyfarnu
Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi
II.2.6) Gwerth amcangyfrifedig
Gwerth heb gynnwys TAW: 15 800 000.00 GBP
II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig
Hyd mewn misoedd: 24
Gall y contract hwn gael ei adnewyddu: Na
II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd
Yr isafswm nifer a ragwelir: 5
II.2.10) Gwybodaeth am amrywiadau
Derbynnir amrywiadau:
Ydy
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn gyfyngedig
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law
Dyddiad:
04/11/2019
Amser lleol: 12:00
IV.2.3) Dyddiad amcangyfrifedig ar gyfer anfon gwahoddiadau i dendro neu i gymryd rhan at yr ymgeiswyr a ddewiswyd
Dyddiad:
19/11/2019
IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan
EN
IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr
Hyd mewn misoedd: 6 (o’r dyddiad a nodwyd i dendr ddod i law)
Section VI: Gwybodaeth ategol
VI.1) Gwybodaeth am ailddigwydd
Caffaeliad cylchol yw hwn:
Na
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
Mr Gus de Silva
Octagon 1006 Shire Hall LGSS Procurement
Cambridge
CB3 0AP
UK
E-bost: GdeSilva@northamptonshire.gov.uk
VI.5) Dyddiad anfon yr hysbysiad hwn
26/09/2019