Noise Insulation Contract for Roads Investment Strategy 2

  • Cyhoeddwyd gyntaf: 22 Hydref 2020
  • Wedi'i addasu ddiwethaf: 22 Hydref 2020

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
Cyhoeddwyd gan:
Highways England
ID Awudurdod:
AA38103
Dyddiad cyhoeddi:
22 Hydref 2020
Dyddiad Cau:
20 Tachwedd 2020
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Highways England is looking to let a contract to manage all aspects of their Noise Insulation Scheme, including reviewing and recommending properties for inclusion, all communications with customers, surveying of properties to specify the requirements, installing of appropriate measures, ensuring the quality and performance of the installation and providing validation evidence to the Client on completion of a property. Provision of high quality customer service is a key requirement and additional information will be required to customers in listed properties. The project only covers residential properties.

100.1 The objectives of the noise insulation project are to deliver guaranteed reduced noise levels in habitable rooms to levels below those which can cause adverse health effects. This will be achieved through installing upgrades to windows and installation of ventilation.

Highways England wishes to mitigate noise at 1150 eligible properties within Noise Important Areas (NIAs) negatively impacted by the Strategic Road Network (SRN).

These properties will comprise 2 different options:

1000 for the main programme with an anticipated 150 properties as infill from other schemes i.e. where they are not mitigated by barrier or resurfacing schemes.

Where occupiers/owners decline to be included in the scheme or do not respond to scheme communications there will be a list of reserve properties in additional NIAs to achieve the required 1150 properties.

NIAs are identified by Defra under their obligation under the European Noise Directive, and represent the areas containing the population most exposed to noise within England.

The noise insulation project covers the entire Strategic Road Network in England, and is supported by Highways England Noise Stakeholder Group, which includes Defra, Public Health England, the Noise Abatement Society, Environmental Protection UK and the UK Noise Association.

The contract will run for 2 years with the option to extend for a further 2 years if the suppliers performance meets the minimum requirements set out in the contract. The extension can be granted in increments e.g. 1 year.

Testun llawn y rhybydd

Hysbysiad contract

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Highways England

Woodlands, Manton Lane

Bedford

MK41 7LW

UK

Ffôn: +44 12345678

E-bost: lesley.cole@highwaysengland.co.uk

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.highwaysengland.co.uk

Cyfeiriad proffil y prynwr: https://highways.bravosolution.co.uk/

I.3) Cyfathrebu

Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:

https://highways.bravosolution.co.uk/


Gellir cael gwybodaeth ychwanegol o'r cyfeiriad uchod


Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:

https://highways.bravosolution.co.uk/


Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:


I.4) Y math o awdurdod contractio

Asiantaeth/swyddfa genedlaethol neu ffederal

I.5) Prif weithgaredd

Gwasanaethau cyhoeddus cyffredinol

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Noise Insulation Contract for Roads Investment Strategy 2

II.1.2) Prif god CPV

71313100

 

II.1.3) Y math o gontract

Gwasanaethau

II.1.4) Disgrifiad byr

Highways England is looking to let a contract to manage all aspects of their noise insulation scheme, including reviewing and recommending properties for inclusion, all communications with customers, surveying of properties to specify the requirements, installing of appropriate measures, ensuring the quality and performance of the installation and providing validation evidence to the Client on completion of a property. Provision of high quality customer service is a key requirement and additional information will be required to customers in listed properties. The project only covers residential properties.

100.1 The objectives of the noise insulation project are to deliver guaranteed reduced noise levels in habitable rooms to levels below those which can cause adverse health effects. This will be achieved through installing upgrades to windows and installation of ventilation.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

45441000

71313100

II.2.3) Man cyflawni

Cod NUTS:

UK

II.2.4) Disgrifiad o’r caffaeliad

Highways England is looking to let a contract to manage all aspects of their Noise Insulation Scheme, including reviewing and recommending properties for inclusion, all communications with customers, surveying of properties to specify the requirements, installing of appropriate measures, ensuring the quality and performance of the installation and providing validation evidence to the Client on completion of a property. Provision of high quality customer service is a key requirement and additional information will be required to customers in listed properties. The project only covers residential properties.

100.1 The objectives of the noise insulation project are to deliver guaranteed reduced noise levels in habitable rooms to levels below those which can cause adverse health effects. This will be achieved through installing upgrades to windows and installation of ventilation.

Highways England wishes to mitigate noise at 1150 eligible properties within Noise Important Areas (NIAs) negatively impacted by the Strategic Road Network (SRN).

These properties will comprise 2 different options:

1000 for the main programme with an anticipated 150 properties as infill from other schemes i.e. where they are not mitigated by barrier or resurfacing schemes.

Where occupiers/owners decline to be included in the scheme or do not respond to scheme communications there will be a list of reserve properties in additional NIAs to achieve the required 1150 properties.

NIAs are identified by Defra under their obligation under the European Noise Directive, and represent the areas containing the population most exposed to noise within England.

The noise insulation project covers the entire Strategic Road Network in England, and is supported by Highways England Noise Stakeholder Group, which includes Defra, Public Health England, the Noise Abatement Society, Environmental Protection UK and the UK Noise Association.

The contract will run for 2 years with the option to extend for a further 2 years if the suppliers performance meets the minimum requirements set out in the contract. The extension can be granted in increments e.g. 1 year.

II.2.5) Meini prawf dyfarnu

Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 24

Gall y contract hwn gael ei adnewyddu: Ydy

Disgrifiad o’r adnewyddiadau:

12 month initial extension with further 12 months up to a maximum of 24 months — subject to satisfactory performance.

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol

III.1) Amodau ar gyfer cymryd rhan

III.1.2) Statws economaidd ac ariannol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.1.3) Gallu technegol a phroffesiynol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.2) Amodau sy’n gysylltiedig â’r contract

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 20/11/2020

Amser lleol: 17:00

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

IV.2.6) Yr isafswm cyfnod gofynnol i’r sawl sy’n tendro gynnal y tendr

Hyd mewn misoedd: 3  (o’r dyddiad a nodwyd i dendr ddod i law)

IV.2.7) Amodau ar gyfer agor tendrau

Dyddiad: 20/11/2020

Amser lleol: 17:00

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.3) Gwybodaeth ychwanegol

The tender documents can be accessed via the Highways Bravo Solutions at 'https://highways.bravosolution.co.uk'

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

See details at VI.4.3

See details at VI.4.3

UK

VI.4.3) Gweithdrefn adolygu

Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:

Highways England will incorporate a minimum 10 calendar day standstill period at the point information on award of the contract is communicated to candidates. Appeals must be lodged in accordance with the Public Contracts Regulations (SI 2015 No. 102) as amended

VI.5) Dyddiad anfon yr hysbysiad hwn

15/10/2020

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45441000 Gwaith gwydro Gwaith paentio a gwydro
71313100 Gwasanaethau ymgynghori ar reoli swn Gwasanaethau ymgynghori ar beirianneg amgylcheddol

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
lesley.cole@highwaysengland.co.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.