Shawfair Energy Centre & District Heating Network

  • Cyhoeddwyd gyntaf: 13 Hydref 2021
  • Wedi'i addasu ddiwethaf: 13 Hydref 2021

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
Cyhoeddwyd gan:
Midlothian Energy Limited (MEL)
ID Awudurdod:
AA81092
Dyddiad cyhoeddi:
13 Hydref 2021
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

Shawfair is a new mix use residential and commercial development in Midlothian, Scotland. A local Energy from Waste plant (EfW) has heat of up to 95°C available as a by-product of its operations for the development area.

This project aims to connect the EfW waste heat to the development and to create a sustainable District Heating Network for the wider Midlothian area.

The heat is to be transported from the EfW to an Energy Centre (EC), from where the heat disperses into a District Heating Network (DHN). The capacity of the DHN will be about 16.5MW. The DHN will connect to both residential units and mixed use space including office, retail and community space.

When heat from the EfW is not available, it must be created at the EC. The EC will be fitted with boilers, thermal stores and other general equipment required for DHN operation, such as pressure keeping, and water quality control. It will also house the control system of the entire network.

Steel based district heating pipes will form the primary network that feeds the warm water to Heat Substations, where the water is hydraulically separated from secondary networks. The Secondary Off Plot networks will be polymer based district heating networks that transport warm water to the boundary of development plots.

NOTE : All Secondary On Plot DHN Networks are for the plot developer to coordinate the connection to all dwellings including the interfaces with the dwellings. This does not form part of this scope.

The build programme for the works included in this contract notice will be approximately 24 months.

The project is new build.

It is anticipated that the contract scope shall include (but is not limited to) design and build of:

- Pipework and connections to EfW heat offtake system

- Energy Centre

- Electrical installation, instrumentation and controls

- Primary DHN Spine

- Initial Heat Sub Stations across wider plot development area

- Initial Off Plot Secondary district heating pipework

The contract will contain options for MEL to instruct the successful contractor to price and carry out the design and build of network extensions to new customers beyond the initial scope listed.

MEL reserves the right to benchmark the price of and additional works under a separate contract notice and potentially award those works to others.

Testun llawn y rhybydd

Hysbysiad dyfarnu contract – cyfleustodau

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Midlothian Energy Limited (MEL)

The Tun Building, 4 Jackson's Entry, Holyrood Road

Edinburgh

EH8 8PJ

UK

E-bost: alistair.ngyou@vattenfall.com

NUTS: UKM73

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://heat.vattenfall.co.uk/

Cyfeiriad proffil y prynwr: https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA30527

I.6) Prif weithgaredd

Cynhyrchu, cludo a dosbarthu nwy a gwres

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Shawfair Energy Centre & District Heating Network

II.1.2) Prif god CPV

45232140

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

MEL is seeking to procure a suitably experienced company to lead the successful design and construction of a heat network for the Shawfair area in Midlothian, Scotland. The heat network development will consist of a connection to a local Energy from Waste Plant, the construction of an Energy Centre complete with back-up boiler plant, District Heating Networks (DHN) and heat substations.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.1.7) Cyfanswm gwerth y caffaeliad

Cynnig isaf:   / Y cynnig uchaf:  

II.2) Disgrifiad

II.2.2) Cod(au) CPV ychwanegol

09300000

09323000

38551000

42515000

44163120

45000000

45232140

45251000

45251250

71311000

71314000

71314310

71700000

II.2.3) Man cyflawni

Cod NUTS:

UKM73


Prif safle neu fan cyflawni:

Shawfair

II.2.4) Disgrifiad o’r caffaeliad

Shawfair is a new mix use residential and commercial development in Midlothian, Scotland. A local Energy from Waste plant (EfW) has heat of up to 95°C available as a by-product of its operations for the development area.

This project aims to connect the EfW waste heat to the development and to create a sustainable District Heating Network for the wider Midlothian area.

The heat is to be transported from the EfW to an Energy Centre (EC), from where the heat disperses into a District Heating Network (DHN). The capacity of the DHN will be about 16.5MW. The DHN will connect to both residential units and mixed use space including office, retail and community space.

When heat from the EfW is not available, it must be created at the EC. The EC will be fitted with boilers, thermal stores and other general equipment required for DHN operation, such as pressure keeping, and water quality control. It will also house the control system of the entire network.

Steel based district heating pipes will form the primary network that feeds the warm water to Heat Substations, where the water is hydraulically separated from secondary networks. The Secondary Off Plot networks will be polymer based district heating networks that transport warm water to the boundary of development plots.

NOTE : All Secondary On Plot DHN Networks are for the plot developer to coordinate the connection to all dwellings including the interfaces with the dwellings. This does not form part of this scope.

The build programme for the works included in this contract notice will be approximately 24 months.

The project is new build.

It is anticipated that the contract scope shall include (but is not limited to) design and build of:

- Pipework and connections to EfW heat offtake system

- Energy Centre

- Electrical installation, instrumentation and controls

- Primary DHN Spine

- Initial Heat Sub Stations across wider plot development area

- Initial Off Plot Secondary district heating pipework

The contract will contain options for MEL to instruct the successful contractor to price and carry out the design and build of network extensions to new customers beyond the initial scope listed.

MEL reserves the right to benchmark the price of and additional works under a separate contract notice and potentially award those works to others.

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Ydy

Disgrifiad o’r opsiynau:

Please refer to section VI.3) Additional information.

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

negodi gyda galwad am gystadleuaeth

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Na

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2021/S 000-020246

Section V: Dyfarnu contract

Dyfernir contract/lot: Na

V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu

Section VI: Gwybodaeth ategol

VI.3) Gwybodaeth ychwanegol

All dates, timescales and values set out in this notice are estimates only and so subject to change during the tender process, if required. The date and time for tender submission will be confirmed in the invitation to negotiate.

The tender evaluation methodology will be published as part of the invitation to negotiate.

Under the terms of this contract the successful supplier(s) will be required to deliver community benefits in support of the MEL’s economic and social objectives. Accordingly, contract performance conditions may relate in particular to social and environmental considerations. The community benefits included in this contract will be detailed within the invitation to negotiate.

Description of options:

The contract value stated above includes a current estimated value for the phase 1 project (capital expenditure of an estimate 20 million GBP). The contract will contain options for MEL to instruct the successful contractor to price and carry out the design and build of network extensions to new customers beyond the initial scope as listed above but estimated to consist of:

- AdditionalPlant Rooms within an adjacent location (excluding civils and utilities)

- Additional Heat Sub Stations across wider plot development area (up to ~4MWth, excluding civils and utilities)

- Additional Primary DHN Spine

- Additional Off Plot Secondary district heating pipework

- Additional Electrical installation, instrumentation and controls

MEL estimates an allowance of a further 5 million GBP for the value of any network extensions that may be instructed at MEL's option.

(SC Ref:670263)

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

Edinburgh Sheriff Court

27 Chambers Street

Edinburgh

EH1 1LB

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

12/10/2021

Codio

Categorïau nwyddau

ID Teitl Prif gategori
42515000 Boeler gwresogi ardal Unedau cyfnewid gwres, cyfarpar aerdymheru ac oereiddio, a pheiriannau hidlo
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog
45251000 Gwaith adeiladu ar gyfer gweithfeydd pwer a gweithfeydd gwres Gwaith adeiladu ar gyfer gweithfeydd, mwyngloddio a gweithgynhyrchu ac ar gyfer adeiladau sy’n gysylltiedig â’r diwydiant olew a nwy
45251250 Gwaith adeiladu gweithfeydd gwresogi ardal Gwaith adeiladu ar gyfer gweithfeydd pwer a gweithfeydd gwres
45232140 Gwaith adeiladu prif gyflenwad gwresogi ardal Gwaith ategol ar gyfer piblinellau a cheblau
71700000 Gwasanaethau monitro a rheoli Gwasanaethau pensaernïol, adeiladu, peirianneg ac archwilio
71314310 Gwasanaethau peirianneg gwresogi ar gyfer adeiladau Ynni a gwasanaethau cysylltiedig
71311000 Gwasanaethau ymgynghori ar beirianneg sifil Gwasanaethau ymgynghorol ar gyfer peirianneg ac adeiladu
09323000 Gwresogi ardal Stêm, dwr poeth a chynhyrchion cysylltiedig
38551000 Mesuryddion ynni Mesuryddion
44163120 Pibellau gwresogi o bell Pibellau a ffitiadau
71314000 Ynni a gwasanaethau cysylltiedig Gwasanaethau ymgynghorol ar gyfer peirianneg ac adeiladu
09300000 Ynni trydan, gwres, solar a niwclear Cynhyrchion petrolewm, tanwydd, trydan a ffynonellau ynni eraill

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
alistair.ngyou@vattenfall.com
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.