Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Dyfarnu Contract

Barbican Fire Project - High Sensitive Fire Doors

  • Cyhoeddwyd gyntaf: 01 Hydref 2024
  • Wedi'i addasu ddiwethaf: 01 Hydref 2024
  • Cofnodi Diddordeb

     

  • Efallai na fydd y ffeil hon yn gwbl hygyrch.

  •  

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-h6vhtk-047242
Cyhoeddwyd gan:
City of London Corporation
ID Awudurdod:
AA20640
Dyddiad cyhoeddi:
01 Hydref 2024
Dyddiad Cau:
-
Math o hysbysiad:
Dyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The City is seeking a Project / Alliance Manager and Employers Agent for the Barbican Renewal Infrastructure Project Phase 1 - RIBA stages 4 to 7 to manage the replacement of MEP Services at the Barbican Centre.

The Project / Alliance Manager and Employers Agent will sign off detailed briefs, schedule of works, anticipated construction cost, monitoring the works and handover and sign off for the project.

Multi-disciplinary Design Team.

General Matters –Project / Alliance Manager and Employers Agent Appointment

Act as the Project / Alliance Manager and Employers Agent for the project during RIBA Stages 4-7.

Manage the input of the multidisciplinary team regarding the full design and specification for RIBA Stages 4-7.

Manage the applications and negotiations for statutory and all other approvals as necessary (e.g. Building Safety Act, Building Control, Network Rail, Party Wall awards, Access licences etc.).

Testun llawn y rhybydd

Hysbysiad dyfarnu contract

Canlyniadau'r weithdrefn gaffael

Adran I: Endid contractio

I.1) Enw a chyfeiriad

City of London Corporation

Guildhall

London

EC2P 2EJ

UK

Ffôn: +44 2076063030

E-bost: Jemma.Borland@cityoflondon.gov.uk

NUTS: UK

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: https://www.cityoflondon.gov.uk/

I.4) Y math o awdurdod contractio

Awdurdod rhanbarthol neu leol

I.5) Prif weithgaredd

Gwasanaethau cyhoeddus cyffredinol

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Barbican Fire Project - High Sensitive Fire Doors

II.1.2) Prif god CPV

71530000

 

II.1.3) Y math o gontract

Gwasanaethau

II.1.4) Disgrifiad byr

The City is seeking a Project / Alliance Manager and Employers Agent for the Barbican Renewal Infrastructure Project Phase 1 - RIBA stages 4 to 7 to manage the replacement of MEP Services at the Barbican Centre.

The Project / Alliance Manager and Employers Agent will sign off detailed briefs, schedule of works, anticipated construction cost, monitoring the works and handover and sign off for the project.

Multi-disciplinary Design Team.

General Matters –Project / Alliance Manager and Employers Agent Appointment

Act as the Project / Alliance Manager and Employers Agent for the project during RIBA Stages 4-7.

Manage the input of the multidisciplinary team regarding the full design and specification for RIBA Stages 4-7.

Manage the applications and negotiations for statutory and all other approvals as necessary (e.g. Building Safety Act, Building Control, Network Rail, Party Wall awards, Access licences etc.).

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.3) Man cyflawni

Cod NUTS:

UK

II.2.4) Disgrifiad o’r caffaeliad

The following is to be provided:

Manage the Alliance under the TAC-1 contract.

Lead and direct the Multi-Disciplinary Design Team and The Main Contractor through the RIBA stage 4 whole design and construction process.

Define the delivery plan for the project, outlining resources, deliverables and milestones for the design and works.

Managing and coordinating the team on the design of systems etc. to deliver the Phase 1 scope of works

Managing the team in providing the RIBA stage 4 design

Managing the provision of technical input during the construction phase.

Managing the review of contractor’s proposals during the construction phase.

Managing the handover phase including checking all required documentation is submitted and is correct.

Ensure all statutory compliance is met throughout the development and execution of the project.

Act as the Contract Administrator for the works.

At the end of RIBA stage 4 assist the City in seeking approval from stakeholders, as required.

This is a fixed fee appointment and is to include all expenses.

The works will be procured through a Term Alliance Contract (TAC -1).

Urgent works are currently being carried out to the drainage, ventilation plant and lifts and this project will need to take account of and interface with these.

Familiarise yourself with the Barbican’s Listed Building Management document.

II.2.5) Meini prawf dyfarnu

Maes prawf ansawdd: Quality / Pwysoliad: 50

Maes prawf ansawdd: Cost / Pwysoliad: 35

Maes prawf ansawdd: Responsible Procurement / Pwysoliad: 15

Price / Pwysoliad:  100

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon

Rhif yr hysbysiad yn OJ S:

2024/S 000-019345

IV.2.9) Gwybodaeth am ddod â chais am gystadleuaeth i ben ar ffurf hysbysiad gwybodaeth ymlaen llaw

Ni fydd yr awdurdod contractio yn dyfarnu contractau pellach yn seiliedig ar yr hysbysiad gwybodaeth ymlaen llaw uchod

Section V: Dyfarnu contract

Teitl: Barbican Renewal Project - Alliance Manager

Dyfernir contract/lot: Na

V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu

Ni ddyfernir y contract/lot

Rhesymau eraill (dirwyn y weithdrefn i ben)

Section VI: Gwybodaeth ategol

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

High Court of England and Wales

Royal Courts of Justice, The Strand

London

WC1A 2LL

UK

VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu

High Court of England and Wales

Royal Courts of Justice, The Strand

London

WC1A 2LL

UK

VI.4.4) Y gwasanaeth lle y gellir cael gwybodaeth am y weithdrefn adolygu

Cabinet Office

70 Whitehall

London

SW1A 2AS

UK

VI.5) Dyddiad anfon yr hysbysiad hwn

27/09/2024

Codio

Categorïau nwyddau

ID Teitl Prif gategori
71530000 Gwasanaethau ymgynghori ar adeiladu Gwasanaethau goruchwylio safleoedd adeiladu

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
Jemma.Borland@cityoflondon.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.