Hysbysiad dyfarnu contract
Canlyniadau'r weithdrefn gaffael
Adran I:
Endid
contractio
I.1) Enw a chyfeiriad
City of London Corporation
Guildhall
London
EC2P 2EJ
UK
Ffôn: +44 2076063030
E-bost: Jemma.Borland@cityoflondon.gov.uk
NUTS: UK
Cyfeiriad(au) rhyngrwyd
Prif gyfeiriad: https://www.cityoflondon.gov.uk/
I.4) Y math o awdurdod contractio
Awdurdod rhanbarthol neu leol
I.5) Prif weithgaredd
Gwasanaethau cyhoeddus cyffredinol
Adran II: Gwrthrych
II.1) Cwmpas y caffaeliad
II.1.1) Teitl
Barbican Fire Project - High Sensitive Fire Doors
II.1.2) Prif god CPV
71530000
II.1.3) Y math o gontract
Gwasanaethau
II.1.4) Disgrifiad byr
The City is seeking a Project / Alliance Manager and Employers Agent for the Barbican Renewal Infrastructure Project Phase 1 - RIBA stages 4 to 7 to manage the replacement of MEP Services at the Barbican Centre.
The Project / Alliance Manager and Employers Agent will sign off detailed briefs, schedule of works, anticipated construction cost, monitoring the works and handover and sign off for the project.
Multi-disciplinary Design Team.
General Matters –Project / Alliance Manager and Employers Agent Appointment
Act as the Project / Alliance Manager and Employers Agent for the project during RIBA Stages 4-7.
Manage the input of the multidisciplinary team regarding the full design and specification for RIBA Stages 4-7.
Manage the applications and negotiations for statutory and all other approvals as necessary (e.g. Building Safety Act, Building Control, Network Rail, Party Wall awards, Access licences etc.).
II.1.6) Gwybodaeth am lotiau
Mae’r contract hwn wedi’i rannu’n lotiau:
Na
II.2) Disgrifiad
II.2.3) Man cyflawni
Cod NUTS:
UK
II.2.4) Disgrifiad o’r caffaeliad
The following is to be provided:
Manage the Alliance under the TAC-1 contract.
Lead and direct the Multi-Disciplinary Design Team and The Main Contractor through the RIBA stage 4 whole design and construction process.
Define the delivery plan for the project, outlining resources, deliverables and milestones for the design and works.
Managing and coordinating the team on the design of systems etc. to deliver the Phase 1 scope of works
Managing the team in providing the RIBA stage 4 design
Managing the provision of technical input during the construction phase.
Managing the review of contractor’s proposals during the construction phase.
Managing the handover phase including checking all required documentation is submitted and is correct.
Ensure all statutory compliance is met throughout the development and execution of the project.
Act as the Contract Administrator for the works.
At the end of RIBA stage 4 assist the City in seeking approval from stakeholders, as required.
This is a fixed fee appointment and is to include all expenses.
The works will be procured through a Term Alliance Contract (TAC -1).
Urgent works are currently being carried out to the drainage, ventilation plant and lifts and this project will need to take account of and interface with these.
Familiarise yourself with the Barbican’s Listed Building Management document.
II.2.5) Meini prawf dyfarnu
Maes prawf ansawdd: Quality
/ Pwysoliad: 50
Maes prawf ansawdd: Cost
/ Pwysoliad: 35
Maes prawf ansawdd: Responsible Procurement
/ Pwysoliad: 15
Price
/ Pwysoliad:
100
II.2.11) Gwybodaeth am opsiynau
Opsiynau:
Na
II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd
Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd:
Na
Section IV: Gweithdrefn
IV.1) Disgrifiad
IV.1.1) Y math o weithdrefn
Gweithdrefn agored
IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)
The procurement is covered by the Government Procurement Agreement:
Ydy
IV.2) Gwybodaeth weinyddol
IV.2.1) Cyhoeddiad blaenorol mewn perthynas â’r weithdrefn hon
Rhif yr hysbysiad yn OJ S:
2024/S 000-019345
IV.2.9) Gwybodaeth am ddod â chais am gystadleuaeth i ben ar ffurf hysbysiad gwybodaeth ymlaen llaw
Ni fydd yr awdurdod contractio yn dyfarnu contractau pellach yn seiliedig ar yr hysbysiad gwybodaeth ymlaen llaw uchod
Section V: Dyfarnu contract
Teitl: Barbican Renewal Project - Alliance Manager
Dyfernir contract/lot:
Na
V.1 Gwybodaeth am benderfyniad i beidio â dyfarnu
Ni ddyfernir y contract/lot
Rhesymau eraill (dirwyn y weithdrefn i ben)
Section VI: Gwybodaeth ategol
VI.4) Gweithdrefnau adolygu
VI.4.1) Corff adolygu
High Court of England and Wales
Royal Courts of Justice, The Strand
London
WC1A 2LL
UK
VI.4.2) Corff sy’n gyfrifol am weithdrefnau cyfryngu
High Court of England and Wales
Royal Courts of Justice, The Strand
London
WC1A 2LL
UK
VI.4.4) Y gwasanaeth lle y gellir cael gwybodaeth am y weithdrefn adolygu
Cabinet Office
70 Whitehall
London
SW1A 2AS
UK
VI.5) Dyddiad anfon yr hysbysiad hwn
27/09/2024