Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad o Gontract

Maternity Unit Ventilation

  • Cyhoeddwyd gyntaf: 29 Medi 2018
  • Wedi'i addasu ddiwethaf: 29 Medi 2018

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
Cyhoeddwyd gan:
Burton Hospitals NHS Foundation Trust
ID Awudurdod:
AA22347
Dyddiad cyhoeddi:
29 Medi 2018
Dyddiad Cau:
27 Hydref 2018
Math o hysbysiad:
Hysbysiad o Gontract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
AMH

Crynodeb

The Trust’s requirement is to increase the airflow through the delivery suites and delivery theatre.

To each of the seven delivery suites, work shall include the installation of:

— a heat retention unit,

— a supply cassette,

— and 2 extract grilles – one of which is in the ceiling grid, and the other at a low level in boxing. Ductwork, chiller plant and pipework are also to be installed, in the ceiling void above the delivery suites and the corridor throughout the ward. All is to be commissioned.

For the delivery theatre, the AHU is to be decommissioned and thoroughly refurbished, then re-commissioned, and some ductwork and extract/supply grilles are to be installed to the ceiling grid in the theatre and surrounding rooms. The mechanical contractor shall take on the role of principal contractor with all associated responsibilities, including appointment of building contractor and electrical contractor to undertake all associated works as described in the attached drawings and specific.

Testun llawn y rhybydd

Hysbysiad contract

Adran I: Endid contractio

I.1) Enw a chyfeiriad

Burton Hospitals NHS Foundation Trust

Queen’s site, Belvedere Road

Burton upon Trent

DE13 0RB

UK

Ffôn: +44 1283566333

E-bost: ross.camsell@nhs.net

NUTS: UKG24

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.burtonhospitals.nhs.uk

I.3) Cyfathrebu

Mae'r dogfennau caffael ar gael ar gyfer mynediad uniongyrchol anghyfyngedig a llawn, yn rhad ac am ddim ar:

https://suppliers.multiquote.com


AGellir cael gwybodaeth ychwanegol o gyfeiriad arall:

Burton Hospitals NHS Foundation Trust

Queen’s site, Belvedere Road

Burton upon Trent

DE13 0RB

UK

Ffôn: +44 1283566333

E-bost: ross.camsell@nhs.net

NUTS: UKG24

Cyfeiriad(au) rhyngrwyd

Prif gyfeiriad: www.burtonhospitals.nhs.uk

Rhaid anfon tendrau neu geisiadau i gymryd rhan yn electronig at:

https://suppliers.multiquote.com


Rhaid anfon tendrau neu geisiadau i gymryd rhan i'r cyfeiriad uchod:


I.4) Y math o awdurdod contractio

Corff a lywodraethir gan gyfraith gyhoeddus

I.5) Prif weithgaredd

Iechyd

Adran II: Gwrthrych

II.1) Cwmpas y caffaeliad

II.1.1) Teitl

Maternity Unit Ventilation

Cyfeirnod: CA5255 - Maternity Vent

II.1.2) Prif god CPV

42512300

 

II.1.3) Y math o gontract

Gwaith

II.1.4) Disgrifiad byr

Install HRU vent system to 7 No. delivery suites and refurbish existing AHU serving delivery theatre.

II.1.6) Gwybodaeth am lotiau

Mae’r contract hwn wedi’i rannu’n lotiau: Na

II.2) Disgrifiad

II.2.3) Man cyflawni

Cod NUTS:

UKG24


Prif safle neu fan cyflawni:

Staffordshire CC

II.2.4) Disgrifiad o’r caffaeliad

The Trust’s requirement is to increase the airflow through the delivery suites and delivery theatre.

To each of the seven delivery suites, work shall include the installation of:

— a heat retention unit,

— a supply cassette,

— and 2 extract grilles – one of which is in the ceiling grid, and the other at a low level in boxing. Ductwork, chiller plant and pipework are also to be installed, in the ceiling void above the delivery suites and the corridor throughout the ward. All is to be commissioned.

For the delivery theatre, the AHU is to be decommissioned and thoroughly refurbished, then re-commissioned, and some ductwork and extract/supply grilles are to be installed to the ceiling grid in the theatre and surrounding rooms. The mechanical contractor shall take on the role of principal contractor with all associated responsibilities, including appointment of building contractor and electrical contractor to undertake all associated works as described in the attached drawings and specific.

II.2.5) Meini prawf dyfarnu

Nid pris yw’r unig faen prawf dyfarnu a dim ond yn y dogfennau caffael y mae’r holl feini prawf wedi’u nodi

II.2.7) Hyd y contract, y cytundeb fframwaith neu’r system brynu ddynamig

Hyd mewn misoedd: 4

Gall y contract hwn gael ei adnewyddu: Na

II.2.9) Gwybodaeth am y cyfyngiadau ar nifer yr ymgeiswyr a gaiff eu gwahodd

II.2.10) Gwybodaeth am amrywiadau

Derbynnir amrywiadau: Na

II.2.11) Gwybodaeth am opsiynau

Opsiynau: Na

II.2.13) Gwybodaeth am Gronfeydd yr Undeb Ewropeaidd

Mae'r broses gaffael yn gysylltiedig â phrosiect a/neu raglen a ariennir gan gronfeydd yr Undeb Ewropeaidd: Na

Section III: Gwybodaeth gyfreithiol, economaidd, ariannol a thechnegol

III.1) Amodau ar gyfer cymryd rhan

III.1.2) Statws economaidd ac ariannol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.1.3) Gallu technegol a phroffesiynol

Meini prawf dethol fel y’u nodir yn y dogfennau caffael


III.2) Amodau sy’n gysylltiedig â’r contract

Section IV: Gweithdrefn

IV.1) Disgrifiad

IV.1.1) Y math o weithdrefn

Gweithdrefn agored

IV.1.8) Gwybodaeth am Gytundeb Caffael y Llywodraeth (GPA)

The procurement is covered by the Government Procurement Agreement: Ydy

IV.2) Gwybodaeth weinyddol

IV.2.2) Terfyn amser i dendrau neu geisiadau i gymryd rhan ddod i law

Dyddiad: 27/10/2018

Amser lleol: 12:00

IV.2.4) Ym mha iaith/ieithoedd y gellir cyflwyno tendrau neu geisiadau i gymryd rhan

EN

IV.2.7) Amodau ar gyfer agor tendrau

Dyddiad: 27/10/2018

Amser lleol: 12:00

Section VI: Gwybodaeth ategol

VI.1) Gwybodaeth am ailddigwydd

Caffaeliad cylchol yw hwn: Na

VI.3) Gwybodaeth ychwanegol

VI.4) Gweithdrefnau adolygu

VI.4.1) Corff adolygu

University Hospitals of Derby and Burton NHS Foundation Trust

Queen's Hospital, Belvedere Road

Burton-upon-Trent

DE13 0RB

UK

Ffôn: +44 12835115116526

E-bost: ross.camsell@nhs.net

VI.4.3) Gweithdrefn adolygu

Gwybodaeth fanwl gywir am y terfyn(au) amser ar gyfer gweithdrefnau adolygu:

VI.5) Dyddiad anfon yr hysbysiad hwn

27/09/2018

Codio

Categorïau nwyddau

ID Teitl Prif gategori
42512300 Pecynnau HVAC Gwaith gosod systemau aerdymheru

Lleoliadau Dosbarthu

ID Disgrifiad
100 DU - I gyd

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
ross.camsell@nhs.net
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.