Skip to main content

Rydym wedi cadw rhai ffeiliau o'r enw cwcis ar eich dyfais. Y cwcis hyn yw:

  • Hanfodol ar gyfer y safle i weithio
  • Helpu i wella ein gwefan drwy gasglu ac adrodd gwybodaeth am sut rydych chi'n ei defnyddio

Hoffem hefyd arbed rhai cwcis i helpu i deilwra cyfathrebu.

BETA
Rydych yn edrych ar fersiwn wedi'i ddiweddaru o'r gwasanaeth hwn - bydd eich adborth yn ein helpu i'w wella.

Hysbysiad Tybiannol

CVL Minor Works Civils and SISS - TAM A Phase 1 Construction

  • Cyhoeddwyd gyntaf: 01 Medi 2023
  • Wedi'i addasu ddiwethaf: 01 Medi 2023

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-134470
Cyhoeddwyd gan:
Transport for Wales Rail Limited (Utility Buyer)
ID Awudurdod:
AA80566
Dyddiad cyhoeddi:
01 Medi 2023
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad Tybiannol
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

Transport for Wales (TfW) exists to drive forward the Welsh Government’s vision of a high quality, safe, integrated, affordable and accessible transport network that the people of Wales are proud of. Transport for Wales is key to delivering the Welsh Government’s key themes as set out in Prosperity for All: The National Strategy. A major element of this vision, TfW are investing in a transformational programme of station projects across the Wales and Borders network. The CVL Transformation programme will deliver commitments to upgrade all stations that form the CVL network, to develop a wider metro style service throughout South Wales. As part of this project, the CVL Minor Works scope will deliver telecoms, security and built environment to each station in time for the introduction of the new rolling stock. The proposal across CVL Minor Works Phase 1 stations predominately consist of installation/replacement/upgrade of existing CCTV system and equipment on station platforms/lease area to meet Network Rail standards. There are also upgrade works to PHP's and CIS's screens along with minor Civils works that include installation of new bike hoops. The Contractor is to refer to AFC drawings and telecoms detailed design for scope specific requirements at the Stations.

Testun llawn y rhybydd

HYSBYSIAD TYBIANNOL – CENEDLAETHOL

WORKS

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Transport for Wales Rail Limited (Utility Buyer)

3 Llys Cadwyn, Pontypridd,

Rhondda Cynon Taf

CF37 4TH

UK

Catherine Sweeney

+44 2920720500


http://www.tfwrail.wales

1.2

Cyfeiriad ar gyfer cael gwybodaeth bellach


Transport for Wales Rail Limited (Utility Buyer)

3 Llys Cadwyn, Pontypridd,

Rhondda Cynon Taf

CF37 4TH

UK


+44 2920720500


http://www.tfwrail.wales

2 Manylion y Contract

2.1

Teitl

CVL Minor Works Civils and SISS - TAM A Phase 1 Construction

2.2

Disgrifiad o'r nwyddau neu'r gwasanaethau sydd eu hangen

Transport for Wales (TfW) exists to drive forward the Welsh Government’s vision of a high quality, safe, integrated, affordable and accessible transport network that the people of Wales are proud of. Transport for Wales is key to delivering the Welsh Government’s key themes as set out in Prosperity for All: The National Strategy.

A major element of this vision, TfW are investing in a transformational programme of station projects across the Wales and Borders network.

The CVL Transformation programme will deliver commitments to upgrade all stations that form the CVL network, to develop a wider metro style service throughout South Wales. As part of this project, the CVL Minor Works scope will deliver telecoms, security and built environment to each station in time for the introduction of the new rolling stock.

The proposal across CVL Minor Works Phase 1 stations predominately consist of installation/replacement/upgrade of existing CCTV system and equipment on station platforms/lease area to meet Network Rail standards. There are also upgrade works to PHP's and CIS's screens along with minor Civils works that include installation of new bike hoops. The Contractor is to refer to AFC drawings and telecoms detailed design for scope specific requirements at the Stations.

NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=134470.

2.3

Cod a Dosbarthiad yr Hysbysiad

32234000 Closed-circuit television cameras
35125300 Security cameras
45213321 Railway station construction work
45230000 Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
45232332 Ancillary works for telecommunications
45234100 Railway construction works
45314000 Installation of telecommunications equipment
51611120 Installation services of railway real-time departures and arrival display screens or boards
1015 Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf)
1016 Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly)

3 Gwybodaeth Weinyddol

3.1

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

N/a

3.2

Dyddiad Dechrau Amcangyfrifedig y Weithdrefn Ddyfarnu

  08 - 09 - 2023

4 Gwybodaeth Arall

4.1

Gwybodaeth Ychwanegol

On the 15th of September at 13:00hrs, there will be an opportunity for all interested parties to join a Teams call with Steve Mayley (Project Manager) and Catherine Sweeney (Senior Project Manager), to run through the scope of works and obtain any additional information regarding what we are trying to deliver.

If any interested parties would like to join the Teams call, then please email the below address so that the meeting invite can be forwarded on.

catherine.sweeney@tfwrail.wales

(WA Ref:134470)

4.2

Lawrlwytho Dogfennaeth Ychwanegol

Dd/g

4.3

Dyddiad cyhoeddi'r hysbysiad hwn

  01 - 09 - 2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
35125300 Camerâu diogelwch System wyliadwriaeth
32234000 Camerâu teledu cylch cyfyng Cyfarpar trosglwyddo radio gyda chyfarpar derbyn
45314000 Gosod cyfarpar telathrebu Gwaith gosod trydanol
45230000 Gwaith adeiladu ar gyfer piblinellau, llinellau cyfathrebu a llinellau pwer, ar gyfer priffyrdd, ffyrdd, meysydd glanio a rheilffyrdd; gwaith ar y gwastad Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil
45213321 Gwaith adeiladu gorsafoedd trenau Gwaith adeiladu ar gyfer adeiladau masnachol, warysau ac adeiladau diwydiannol, adeiladau sy’n gysylltiedig â thrafnidiaeth
45234100 Gwaith adeiladu rheilffyrdd Gwaith adeiladu ar gyfer rheilffyrdd a systemau cludiant ceblau
45232332 Gwaith ategol ar gyfer telathrebu Gwaith ategol ar gyfer piblinellau a cheblau
51611120 Gwasanaethau gosod sgriniau neu fyrddau arddangos gadael a chyrraedd amser real ar gyfer rheilffyrdd Gwasanaethau gosod cyfrifiaduron

Lleoliadau Dosbarthu

ID Disgrifiad
1015 Cymoedd Canalog (Merthyr Tudful, Rhondda Cynon Taf)
1016 Cymoedd Gwent (Torfaen, Blaenau Gwent, Caerffili)

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Ynglŷn â'r prynwr

Prif gyswllt:
N/a
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.

Cwestiynau ac Atebion

Gofyn unrhyw gwestiynau y gall fod gennych ynghylch yr hysbysiad hwn i'r prynwr. Er mwyn gofyn cwestiwn neu gwestiynau i'r prynwr cliciwch ar y botwm "Gweld Cwestiynau ac Atebion".


0800 222 9004

Mae'r llinellau ar agor rhwng 8:30am a 5pm o ddydd Llun i ddydd Gwener.

Rydym yn croesawu galwadau'n Gymraeg.

We welcome calls in Welsh.