The proposal seeks to improve continuation of work of the scheme which commenced development in 23/24 schemes which would see the upgrade of the existing footways to Active Travel shared use standard at Pill Millenium Field, Pillgwenlly.
This project is to commission a contractor to undertake construction works to provide connectivity in the ward of Pillgwenlly, Newport and specifically to improve active travel connectivity as a viable alternative for residents to travel between the centre of Pill to the new residential development, at the former Whiteheads site, on the outskirts of the ward. In particular, the route should enable residents to access the new school building that is currently being constructed on the site of the former Whiteheads land.
Testun llawn y rhybydd
HYSBYSIAD O GONTRACT - CENEDLAETHOL
|
WORKS |
1 Manylion yr Awdurdod
|
1.1
|
Enw a Chyfeiriad yr Awdurdod
|
|
Newport City Coucil |
Procurement Department, Newport Civic Centre, Godfrey Road, |
Newport |
NP204UR |
UK |
Michael Owen |
+44 1633987787 |
michael.owen@newport.gov.uk |
|
http://www.newport.gov.uk https://etenderwales.bravosolution.co.uk/home.html https://etenderwales.bravosolution.co.uk/home.html |
|
1.2
|
Cyfeiriad ar gyfer cael dogfennaeth
Fel yn I.1
|
1.3
|
Mae'n rhaid dychwelyd dogfennau wedi'u cwblhau at:
Fel yn I.1
|
2 Manylion y Contract
|
2.1
|
Teitl
NCC202402140 - Footway Upgrades at Millennium Park
|
2.2
|
Disgrifiad o'r nwyddau neu'r gwasanaethau sydd eu hangen
The proposal seeks to improve continuation of work of the scheme which commenced development in 23/24 schemes which would see the upgrade of the existing footways to Active Travel shared use standard at Pill Millenium Field, Pillgwenlly.
This project is to commission a contractor to undertake construction works to provide connectivity in the ward of Pillgwenlly, Newport and specifically to improve active travel connectivity as a viable alternative for residents to travel between the centre of Pill to the new residential development, at the former Whiteheads site, on the outskirts of the ward. In particular, the route should enable residents to access the new school building that is currently being constructed on the site of the former Whiteheads land.
NOTE: The authority is using eTenderwales to carry out this procurement process. To obtain further information record your interest on Sell2Wales at https://www.sell2wales.gov.wales/search/search_switch.aspx?ID=144426
|
2.3
|
Cod a Dosbarthiad yr Hysbysiad
|
|
|
|
|
45233161 |
|
Footpath construction work |
|
45233253 |
|
Surface work for footpaths |
|
45233300 |
|
Foundation work for highways, roads, streets and footpaths |
|
45233340 |
|
Foundation work for footpaths |
|
|
|
|
|
1021 |
|
Monmouthshire and Newport |
|
2.4
|
Cyfanswm maint neu gwmpas y tendr
The proposal seeks to improve continuation of work of the scheme which commenced development in 23/24 schemes which would see the upgrade of the existing footways to Active Travel shared use standard at Pill Millenium Field, Pillgwenlly.
This project is to commission a contractor to undertake construction works to provide connectivity in the ward of Pillgwenlly, Newport and specifically to improve active travel connectivity as a viable alternative for residents to travel between the centre of Pill to the new residential development, at the former Whiteheads site, on the outskirts of the ward. In particular, the route should enable residents to access the new school building that is currently being constructed on the site of the former Whiteheads land.
The scheme is a direct response to the authority’s commitment to the Welsh Government’s commitment to Active Travel, seeking to provide a community link that is safe and viable for pedestrians and cyclists. The aim of the Action Plan is to enable and direct authorities to provide upgrades that contribute to cleaner air, fewer car journeys, active lifestyle choices and reduced carbon emissions.
|
3 Amodau ar gyfer Cymryd Rhan
|
3.1
|
Safonau gofynnol a'r cymhwyster sydd ei angen
Please refer to the qualification envelope detailed within e-Tender Wales.
|
4 Gwybodaeth Weinyddol
|
4.1
|
Math o Weithdrefn
Un cam
|
4.2
|
Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio
NCC202402140
|
4.3
|
Terfynau Amser
|
|
Terfyn amser ar gyfer derbyn tendrau wedi'u cwblhau
18
- 10
- 2024
Amser 12:00
Dyddiad dyfarnu amcangyfrifedig
04
- 11
- 2024 |
4.5
|
Yr iaith neu'r ieithoedd y gellir ei/eu defnyddio i lunio tendrau neu geisiadau i gymryd rhan
EN
|
4.6
|
Blwch Postio Cyflwyno Tendrau
|
5 Gwybodaeth Arall
|
5.1
|
Gwybodaeth Ychwanegol
(WA Ref:144426)
|
5.2
|
Dogfennaeth Ychwanegol
|
5.3
|
Dyddiad cyhoeddi'r hysbysiad hwn
09
- 09
- 2024 |
Codio
Categorïau nwyddau
ID |
Teitl
|
Prif gategori
|
45233161 |
Gwaith adeiladu llwybrau troed |
Gwasanaethau sy’n gysylltiedig ag adeiladu |
45233253 |
Gwaith ar yr wyneb ar gyfer llwybrau troed |
Gwasanaethau sy’n gysylltiedig ag adeiladu |
45233340 |
Gwaith sylfeini ar gyfer llwybrau troed |
Gwasanaethau sy’n gysylltiedig ag adeiladu |
45233300 |
Gwaith sylfeini ar gyfer priffyrdd, ffyrdd, strydoedd a llwybrau troed |
Gwasanaethau sy’n gysylltiedig ag adeiladu |
Lleoliadau Dosbarthu
ID |
Disgrifiad
|
1021 |
Sir Fynwy a Chasnewydd |
Cyfyngiadau Rhanbarthol ar y Rhybuddion
Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.
ID |
Disgrifiad
|
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.
|
Gwybodaeth bellach
Dyddiad
|
Manylion
|
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.
|