Manylion y contract
-
ID:
- 161688
-
OCID:
- ocds-kuma6s-158530
-
Math o gontract:
- Gwaith
-
Math o weithdrefn:
- Agored
-
Hysbysiad dyfarnu contract cyf:
-
FEB589096
-
Cyf mewnol:
- Portal Ref: 161688
-
Cysylltwch â'r Catergory:
- C - contract lleol ar ran un prynwr sy'n contractio yn unig.
-
Prynwr:
- Careers Wales
-
Cod CPV cynradd:
- N/a
-
Cod (au) CPV ychwanegol:
-
A yw'n fframwaith:
- Nac Ydi
-
Cynllun lleihau carbon:
-
Dewisiadau:
-
Disgrifiad:
- 1.Introduction
This PCI has been prepared to highlight principle health and safety
issues arising from the proposed fitting out of Careers Wales Barry, 49 Holton Rd, Barry CF63 4HF
Regulation 4: (4) A client must provide pre-construction information as soon as is practicable to every designer and contractor appointed, or being considered for appointment, to the project.
Regulation 11: (6) The principal designer must—
Assist the client in the provision of the pre-construction information required by regulation
4(4); and
(b) so far as it is within the principal designer’s control, provide pre-construction information, promptly and in a convenient form, to every designer and contractor appointed, or being considered for appointment, to the project.
Regulation 12:
(3) The principal designer must assist the principal contractor in preparing the construction phase plan by providing to the principal contractor all information the principal designer holds that is 4 of the PCI relevant to the construction phase plan including—
(a) Pre-construction information obtained from the client;
Any information obtained from designers under regulation 9(3)(b).
The Principal Contractor shall use and develop this information as part of his duties and responsibilities under the CDM Regulations.
Regulation 4(5): A client must ensure that—
(a) before the construction phase begins, a construction phase plan is drawn up by the contractor if there is only one contractor, or by the principal contractor: …….
Regulation 12:
(1) During the pre-construction phase, and before setting up a construction site, the principal contractor must draw up a construction phase plan or make arrangements for a construction phase plan to be drawn up.
(2) The construction phase plan must set out the health and safety arrangements and site rules taking account, where necessary, of the industrial activities taking place on the construction site and, where applicable, must include specific measures concerning work which falls within one or more of the categories set out in Schedule 3.
This document should be read in conjunction with the associated PCI information referred to within.
Description of project
The refurbishment of part of Careers Wales Barry, 49 Holton Rd, Barry CF63 4HF
. The works will consist of: -
Softstrip
Supply & Install floor coverings
Supply & install ceilings
Supply & install Partitions / Wall Lining / Doors Sets
Supply & install Timber Skirting Works
Tape & jointing
Internal decoration
Electrical/ small power
Fire Signage
Lighting
Ventilation
Tea Point
Glazed Manifestation
Tiling
Disabled Toilet Pack
The project is Notifiable under CDM 2015.
The location of the site:
49 Holton Rd, Barry CF63 4HF
Project Dates: Early December 2025 (TBC)
Proposed Completion: Early February 2025 (TBC)
Client: Careers Wales, Churchill House, Cardiff, CF10 2HH
Principal Designer: To be appointed designers by the Principle contractor in line with Careers Wales requirements.
Other Consultants / Designers: To be appointed by Principle Contractor
Proposed use of structure / building: Under the Workplace (Health, Safety and Welfare) Regulation 1992 a workplace is defined as any premises or part of premises which are made available to any person as a place of work, and includes:
any place within the premises to which such person has access while at work; and
ii. any room, lobby, corridor, staircase, road or other place used as a means of access from that place of work or where facilities are provided for use in connection with the place of work other than a public road.
The site will be deemed a workplace under the aforementioned regulations and therefore must comply with the provisions of the regulations
Existing records and plans
A list of available information relevant to this project can be found within the contract documentation. It should be noted that any record drawings and information provided by the client, project manager o
-
Tîm Prynu:
- N/a
Dyddiadau'r contract
-
Dyddiad a ddyfarnwyd:
- 14 Ionawr 2026
-
Dyddiad cychwyn:
- 14 Ionawr 2026
-
Dyddiad gorffen:
- 14 Gorffennaf 2026
Estyniadau contract
-
Opsiynau estyniad Max ar gael:
- 0 (misoedd)
Gwybodaeth ychwanegol
-
Gwybodaeth ychwanegol:
Manylion cyswllt
-
Enw'r contract:
- Mr Paul Powell
-
E-bost contract:
- N/a
Cyflenwyr llwyddiannus
Isod mae rhestr o'r holl gyflenwyr llwyddiannus ar gyfer y contract hwn. Gellir dewis cyflenwyr hefyd ar gyfer LOTIAU penodol (os yw'n berthnasol) a gallant hefyd gael un neu fwy o isgontractwyr y gellir eu hychwanegu trwy'r tab Is gonontractwyr."
Lotiau
Isod mae manylion y symiau y mae'r contract wedi'u rhannu. I weld y cyflenwyr sydd wedi derbyn pob un o'r lots, ewch i'r adran Cyflenwyr.
Nid oes llawer wedi ei ychwanegu ar gyfer y contract hwn.
Cyflenwyr
Isod mae manylion y cyflenwyr llwyddiannus ar gyfer y contract hwn.
|
Rhif Lot
|
Enw
|
Tref
|
Côd post
|
DUNS rhif
|
Gwerth
|
|
Manning Construction Limited |
Bridgend |
CF355BU |
999999999 |
0 |
Prynwyr sy'n cydweithio
Isod mae'r prynwyr sy'n cydweithio ar y contract hwn.
Dim prynwyr sy'n cydweithredu i'w dangos.
Galwadau i ffwrdd
Contract yn galw i ffwrdd.
Nid yw'r contract hwn yn defnyddio galwadau i ffwrdd.
Negeseuon
Nid yw'r cytundeb hwn yn defnyddio negeseuon.