Hysbysiad o Ddyfarnu Contract

Towyn to Kinmel Bay Cycle Link

  • Cyhoeddwyd gyntaf: 13 Chwefror 2023
  • Wedi'i addasu ddiwethaf: 13 Chwefror 2023

Nid yw'r prynwr yn defnyddio'r wefan hon i weinyddu'r hysbysiad.

I gofnodi eich diddordeb neu gael gwybodaeth neu ddogfennau ychwanegol, darllenwch y cyfarwyddiadau yn Nhestun Llawn yr Hysbysiad. (NODER: Nid oes angen ymateb i Hysbysiadau Dyfarnu Contractau a Hysbysiadau Gwybodaeth Ymlaen Llaw fel arfer)

Cynnwys

Crynodeb

OCID:
ocds-kuma6s-113698
Cyhoeddwyd gan:
Conwy County Borough Council
ID Awudurdod:
AA0389
Dyddiad cyhoeddi:
13 Chwefror 2023
Dyddiad Cau:
-
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Mae ganddo ddogfennau:
Nac Ydi
Wedi SPD:
Nac Ydi
Mae ganddo gynllun lleihau carbon:
Nac Ydi

Crynodeb

The project is entitled Towyn to Kinmel Bay Cycle Link The works were to include, but not limited to:- a) General site clearance and preparation b) Traffic Management c) Earthworks d) Kerbing e) Paving f) Road markings / signage g) Drainage The purpose of the proposed Towyn to Kinmel Bay Cycle Link Scheme was to provide cyclists with a safe off-carriageway cycle route, complying with Active Travel Wales guidance, which will link the end of an existing route to Towyn Centre through Towyn Park. The proposed works comprised the widening of an existing footway/cycleway along A548 Towyn Road to provide a 4m wide shared route. Existing park paths were to be planed out and reconstructed as 3m wide paths. These works included the associated relocation of street furniture and new signage. Roundabouts were proposed to differentiate the movements of cyclists and pedestrians at the junctions on the park paths. A new 3m wide footway/cycleway facility running along the eastern boundary of the park was to be constructed to connect Towyn Park to Gors Road, via Kinmel Way. The new cycleway design included the provision of drainage pipes with 225mm internal diameter to avoid severance of an existing over-ground run off path. The new path was to run parallel to an existing drainage channel with a 5m wide offset to provide maintenance access. The existing Gors Road and Kinmel Way junction was to be raised for the construction of a speed table for traffic calming. This work included raising ironwork and providing new road markings and road signs.

Testun llawn y rhybydd

HYSBYSIAD O DDYFARNU CONTRACT - CENEDLAETHOL

WORKS

1 Manylion yr Awdurdod

1.1

Enw a Chyfeiriad yr Awdurdod


Conwy County Borough Council

Environment Roads & Facilities, Bodlondeb, Bangor Road,

Conwy

LL32 8DU

UK

Dyfed Thomas

+44 1492574000

dyfed.thomas@conwy.gov.uk

http://www.conwy.gov.uk

2 Manylion y Contract

2.1

Teitl

Towyn to Kinmel Bay Cycle Link

2.2

Disgrifiad o'r contract

The project is entitled Towyn to Kinmel Bay Cycle Link

The works were to include, but not limited to:-

a) General site clearance and preparation

b) Traffic Management

c) Earthworks

d) Kerbing

e) Paving

f) Road markings / signage

g) Drainage

The purpose of the proposed Towyn to Kinmel Bay Cycle Link Scheme was to provide cyclists with a safe off-carriageway cycle route, complying with Active Travel Wales guidance, which will link the end of an existing route to Towyn Centre through Towyn Park.

The proposed works comprised the widening of an existing footway/cycleway along A548 Towyn Road to provide a 4m wide shared route. Existing park paths were to be planed out and reconstructed as 3m wide paths. These works included the associated relocation of street furniture and new signage. Roundabouts were proposed to differentiate the movements of cyclists and pedestrians at the junctions on the park paths.

A new 3m wide footway/cycleway facility running along the eastern boundary of the park was to be constructed to connect Towyn Park to Gors Road, via Kinmel Way. The new cycleway design included the provision of drainage pipes with 225mm internal diameter to avoid severance of an existing over-ground run off path. The new path was to run parallel to an existing drainage channel with a 5m wide offset to provide maintenance access. The existing Gors Road and Kinmel Way junction was to be raised for the construction of a speed table for traffic calming. This work included raising ironwork and providing new road markings and road signs.

2.3

Cod a Dosbarthiad yr Hysbysiad

45000000 Construction work
45200000 Works for complete or part construction and civil engineering work
45220000 Engineering works and construction works
45222000 Construction work for engineering works except bridges, tunnels, shafts and subways
45233253 Surface work for footpaths
45233300 Foundation work for highways, roads, streets and footpaths
45233340 Foundation work for footpaths
1013 Conwy and Denbighshire

2.4

Amcangyfrif o Gyfanswm Gwerth

3 Gweithdrefn

3.1

Math o Weithdrefn

Un cam

4 Dyfarnu Contract

4.1

Cynigwyr Llwyddiannus

4.1.1

Enw a Chyfeiriad y cyflenwr, contractwr neu ddarparwr gwasanaeth llwyddiannus





G H James Cyf

Units 1 - 3, Utica Buildings Trawsfynydd,

Blaenau Ffestiniog

LL414DU

UK




www.jamescyf.co.uk

5 Gwybodaeth Arall

5.1

Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio

ERTN2003S

5.2

Dyddiad Dyfarnu'r Contract

  15 - 11 - 2021

5.3

Nifer y tendrau a dderbyniwyd

3

5.4

Gwybodaeth Arall

(WA Ref:128799)

5.5

Dogfennaeth Ychwanegol

Dd/g

5.6

Dyddiad cyhoeddi'r hysbysiad hwn:

  13 - 02 - 2023

Codio

Categorïau nwyddau

ID Teitl Prif gategori
45000000 Gwaith adeiladu Adeiladu ac Eiddo Tiriog
45222000 Gwaith adeiladu ar gyfer gwaith peirianneg heblaw pontydd, twneli, siafftiau ac isffyrdd Gwaith peirianneg a gwaith adeiladu
45200000 Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil Gwaith adeiladu
45233253 Gwaith ar yr wyneb ar gyfer llwybrau troed Gwasanaethau sy’n gysylltiedig ag adeiladu
45220000 Gwaith peirianneg a gwaith adeiladu Gwaith ar gyfer gwaith adeiladau cyflawn neu rannol a gwaith peirianneg sifil
45233340 Gwaith sylfeini ar gyfer llwybrau troed Gwasanaethau sy’n gysylltiedig ag adeiladu
45233300 Gwaith sylfeini ar gyfer priffyrdd, ffyrdd, strydoedd a llwybrau troed Gwasanaethau sy’n gysylltiedig ag adeiladu

Lleoliadau Dosbarthu

ID Disgrifiad
1013 Conwy a Sir Ddinbych

Cyfyngiadau Rhanbarthol ar y Rhybuddion

Mae’r prynwr wedi cyfyngu’r rhybuddion ar gyfer yr hysbysiad hwn i gyflenwyr yn y rhanbarthau canlynol.

ID Disgrifiad
Nid oes cyfyngiadau ar y rhybuddion ar gyfer yr hysbysiad hwn.

Teulu dogfennau

Manylion hysbysiad
Dyddiad cyhoeddi:
14 Medi 2021
Dyddiad Cau:
14 Hydref 2021 00:00
Math o hysbysiad:
Hysbysiad o Gontract
Enw Awdurdod:
Conwy County Borough Council
Dyddiad cyhoeddi:
13 Chwefror 2023
Math o hysbysiad:
Hysbysiad o Ddyfarnu Contract
Enw Awdurdod:
Conwy County Borough Council

Ynglŷn â'r prynwr

Prif gyswllt:
dyfed.thomas@conwy.gov.uk
Cyswllt gweinyddol:
N/a
Cyswllt technegol:
N/a
Cyswllt arall:
N/a

Gwybodaeth bellach

Dyddiad Manylion
Nid oes unrhyw wybodaeth bellach wedi'i lanlwytho.