HYSBYSIAD O GONTRACT - CENEDLAETHOL
|
| WORKS |
1 Manylion yr Awdurdod
|
1.1
|
Enw a Chyfeiriad yr Awdurdod
|
|
Snowdonia National Park Authority/Awdurdod Parc Cenedlaethol Eryri |
Warden and Access, Penrhyndeudraeth, |
Gwynedd |
LL48 6LF |
UK |
Adam Daniel |
+44 1766770274 |
|
|
www.eryri.llyw.cymru www.sell2wales.gov.wales |
|
1.2
|
Cyfeiriad ar gyfer cael dogfennaeth
Snowdonia National Park Authority/Awdurdod Parc Cenedlaethol Eryri |
Penrhyndeudraeth, |
Gwynedd |
LL48 6LF |
UK |
Capel Curig / Crafnant Bridleway Restoration |
+44 1766770274 |
adam.daniel@eryri.llyw.cymru |
|
| www.eryri.llyw.cymru |
|
1.3
|
Mae'n rhaid dychwelyd dogfennau wedi'u cwblhau at:
Snowdonia National Park Authority/Awdurdod Parc Cenedlaethol Eryri |
Solicitor and Monitoring Officer, Solicitor and Monitoring Officer, Snowdonia National Park Authority, |
Penrhyndeudraeth |
LL48 6LF |
UK |
Capel Curig / Crafnant Bridleway Restoration |
+44 1766770274 |
iwan.jones@eryri.llyw.cymru |
|
| www.eryri.llyw.cymru |
|
2 Manylion y Contract
|
2.1
|
Teitl
Capel Curig / Crafnant Bridleway Restoration
|
2.2
|
Disgrifiad o'r nwyddau neu'r gwasanaethau sydd eu hangen
Scope of Works
The work specified within this tender is situated between Llyn Crafnant and the A5 trunk road at Capel Curig. The purpose of the work is to improve the existing R.O.W. infrastructure between the Ogwen and Conwy valleys and to significantly reduce the risk of further degradation and erosion of this fragile landscape.
The work will be undertaken in accordance with accepted and long-established good working practices. Construction techniques will be environmentally sound and will focus on sustainable construction, with minimal future maintenance costs. It is crucial that the paths have minimal visual impact on the landscape and should provide the user with an intimate experience of the surrounding area. The path should work with the terrain rather than working through it.
The construction will be of a solid surface technique (dictated by the terrain and underlying geology) with extensive sections of aggregate surfacing, and some sections requiring partial floating over soft terrain. Some sections will also require significant drainage management (to minimise impediment and maintain the natural flow) necessitating in the construction of cross culverting and ballast filled side drainage (approx. 90% of drainage construction will utilise the pre-existing and extensive ditching network to be found on site). Further works will include the replacement of gates.
NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at https://www.sell2wales.gov.wales/Search/Search_Switch.aspx?ID=114697.
|
2.3
|
Cod a Dosbarthiad yr Hysbysiad
|
|
|
|
|
45233161 |
|
Footpath construction work |
|
45233253 |
|
Surface work for footpaths |
|
45233340 |
|
Foundation work for footpaths |
|
|
|
|
|
1000 |
|
WALES |
|
1010 |
|
West Wales and The Valleys |
|
1011 |
|
Isle of Anglesey |
|
1012 |
|
Gwynedd |
|
1013 |
|
Conwy and Denbighshire |
|
1014 |
|
South West Wales (Carmarthenshire, Pembrokeshire, Ceredigion) |
|
1015 |
|
Central Valleys (Merthyr Tydfil, Rhondda Cynon Taf) |
|
1016 |
|
Gwent Valleys (Torfaen, Blaenau Gwent, Caerphilly) |
|
1017 |
|
Bridgend and Neath Port Talbot |
|
1018 |
|
Swansea |
|
1020 |
|
East Wales |
|
1021 |
|
Monmouthshire and Newport |
|
1022 |
|
Cardiff and Vale of Glamorgan |
|
1023 |
|
Flintshire and Wrexham |
|
1024 |
|
Powys |
|
2.4
|
Cyfanswm maint neu gwmpas y tendr
The total length of bridleway to be repaired is approximately 2km.
The contractor will be expected to supply all materials, labour and machinery unless otherwise stated in the contract documents.
It is estimated that the contact duration will be approximately 5 months (dependant on site conditions, weather etc)
|
3 Amodau ar gyfer Cymryd Rhan
|
3.1
|
Safonau gofynnol a'r cymhwyster sydd ei angen
Potential bidders should have a minimum of 5 years experience of this type of work, and should posess extensive evidence of previous similar work (photographs, testimonials etc.)
This is a weighted contract, the weighting being given as thus:-
Price 60%
Experience 40% (further split 60% rural / PROW work 40% H&S
record keeping - method statments, risk
assesments emergency site planning, pollution
mitigation and control etc.)
|
4 Gwybodaeth Weinyddol
|
4.1
|
Math o Weithdrefn
Un cam
|
4.2
|
Rhif cyfeirnod a roddwyd i'r hysbysiad gan yr awdurdod contractio
N/a
|
4.3
|
Terfynau Amser
|
|
Terfyn amser ar gyfer derbyn tendrau wedi'u cwblhau
15
- 10
- 2021
Amser 12:00
Dyddiad dyfarnu amcangyfrifedig
19
- 10
- 2021 |
4.5
|
Yr iaith neu'r ieithoedd y gellir ei/eu defnyddio i lunio tendrau neu geisiadau i gymryd rhan
EN
|
4.6
|
Blwch Postio Cyflwyno Tendrau
|
5 Gwybodaeth Arall
|
5.1
|
Gwybodaeth Ychwanegol
All relevant and additional information is contained within the contract document / scope of works.
If potential bidders should require further information this can be obtained by contacting the head of the Warden service, Adam Daniel on:-
07766 255 505
adam.daniel@eryri.llyw.cymru
(WA Ref:114697)
|
5.2
|
Dogfennaeth Ychwanegol
|
|
scope of works crafnant - FINAL 08102021 |
|
|
5.3
|
Dyddiad cyhoeddi'r hysbysiad hwn
08
- 10
- 2021 |