Disgrifiad caffael
The contract comprises five core interlinked phases of work across the South and West elevations, alongside localised internal remediation:
• Asbestos Remediation: The safe, licensed containment, removal, and disposal of identified asbestos-containing materials (ACMs), specifically focusing on the external window mastic and internal packing panels.
• Window Replacement: De-glazing, removal, and lawful disposal of degraded window units, followed by the installation of high-performance, thermally broken, double-glazed aluminium units matching original architectural sightlines.
• Structural Concrete Repairs: Mechanical breakout of defective cladding panels to a sound core, preparation and priming of exposed reinforcement steel, and profiling using a structural polymer-modified mortar system.
• Anti-Carbonation Protective Coating: Application of a breathable, anti-carbonation surface treatment across the repaired external concrete cladding panels to ensure long-term structural integrity and aesthetic consistency.
• Minor Internal Making Good: Plasterwork repairs, drywall stabilization, and complete redecoration of internal window reveals, sills, and adjacent walls impacted by the window extraction.