Disgrifiad o'r contract
Full Phase I Habitat Surveys of the 6 sites shown in Figure 1 following the standard methodology
recommended by JNCC ( Handbook for Phase 1 habitat survey a
technique for environmental
audit 2010 Edition ) is required to determine the likelihood of UK, European and BAP species using
the site and the presence and location of any BAP/LWS habitats or other designations present on
or adjacent to the site that may be sensitive to disturbance. Particular attention will be paid to
Target Notes to be used as information for the Phase 2 Habitat and Species Action Plans, and to
indicate any further habitat or species surveys.
The valley has been divided into 6 survey areas to reflect the contrasting habitat types of the area
and to facilitate the engagement of smaller firms.
The surveys are expected to commence in April 2016 and be complete as soon as possible
thereafter.
|